My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-08-1994 Council Packet
Orono
>
City Council
>
1994
>
08-08-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2023 10:06:40 AM
Creation date
12/11/2023 10:04:34 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO COUNCIL MEETING HELD <br />JULY 25, 1994 <br />BID AWARD NORTH BROWIV ROAD RECONSTRUCTION (CONTINLTID) <br />Mayor Callahan confirmed there will be no assessment to the neighboring residents. Gerhardson <br />stated construction would begin in mid-August. Individual landowners will be contacted. <br />Armard Brachman and George Johnson com.mented that •••.wt had already made contacts with <br />the residents and had been working with them to address th.:-- conc^.-ns. <br />Mayor Callahan called a recess from 8:58 p.m. to 9:12 p.rn. <br />KELLY AVENUE DRALNAGE <br />Engineer Cook reviewed the Kelly Avenue drainage problem. Current culverts are not <br />functioning properly. The existing system should be replaced with culverts placed in correct <br />locations. He referred to a diagram with four alternate solutions. Alternatives C or D best <br />address the water quality problem. There would be somewhat less maintenance with Alternative <br />D. Easement costs and tree removal have not been included in the project estimates. Raising <br />Kelly Avenue had been considered but there is still the potential for damcge and it really doesn’t <br />take care of the drainage problem. Since no individual property owner will realize significant <br />benefit, it is difficult to do a special assessment on this type of project. A storm water utility <br />could be initiated City-wide to provide funding for these types of projects. Similar situations <br />exist on Highland and Livingston. <br />Kelly and Jabbour felt this was a very dangerou.s area and preliminaiy discussions should <br />continue with property owners in the area. <br />Goetten felt there was a responsibility to the citizens of Orono to address this problem. <br />Hurr did not feel the proposed schedule was realistic with construction proposed for September <br />19, 1994. <br />Mayor Callahan noted the possible cost was $70,000 plus unknown amounts to obtain easements <br />and this information should be provided to residents. Gerhardson will do a written request to <br />property owners to funher discuss the project. <br />MAYOR/COUNCIL REPORT <br />Hurr reported that she had attended the Minnehaha Creek Watershed District meetings related <br />to the water quality of Long Lake. Aeration and chemical (alum) treatment were discussed. <br />The MCWD would assume the major costs but asked if Orono would participate. Hurr indicated <br />to the MCWD that she would need more information before the City could commit to <br />participation. <br />Mayor Callahan commented on the LMCD report regarding septic tank problems. He noted the <br />State Statutes supersede the Shoreland Regulations of the DNR. <br />8
The URL can be used to link to this page
Your browser does not support the video tag.