My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-08-1994 Council Packet
Orono
>
City Council
>
1994
>
08-08-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2023 10:06:40 AM
Creation date
12/11/2023 10:04:34 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO COUNCIL MEETING HELD <br />JULY 25, 1994 <br />BID AWARD NORTH BROWN ROAD RECONSTRUCTION (CONTINUED) <br />City Administrator Moorse explained that if there were to be assessments considered on this <br />project, a public hearing would have to be held before the bid could be awarded. <br />Dennis Kirby, 1020 Nonh Brown Road, did not feel there was opposition to the road but there <br />was a problem with assessments. <br />Armand Brachman. 1990 West Farm Road, commented that he moved to Orono because of the <br />rural residential character of the area. He felt that two issues to be considered were the degree <br />to which the road needs to be improved and who will pay for the road. He felt that a uniform <br />process needs to be established to address the current and fumre road improvement needs. Who <br />should be responsible for assessments should also be considered. <br />Mayor Callahan reiterated that if the bid were accepted at this meeting, there would be no <br />assessments. He continued that comments made about this being a collector road were <br />compelling arguments to consider. The gap of $25,000 is not a major amount for the City and <br />felt, in this case, the bid should be awarded with no assessments to the residents. <br />It was moved by Hurr, seconded by Jabbour, to award the bid for the Brown Road North <br />reconstruction project and the Watertown Road culvert replacement project to the low bidder <br />Buffalo Bituminous, contingent upon MSA approval, in the amount of $473,614 for Brown Road <br />and $92,892.50 for the Watertown Road culvert with no special assessments to the residents. <br />Ayes 5, nays 0. <br />George Johnson asked about the 8’ bike path. Cook explained that the 8’ width was a <br />recommendation from the Park Commission and was not a requirement of MSA funds. <br />Kelley asked how difficult it was to get variances for MSA funds. Cook explained there was <br />an application and then a panel review. He added it would be difficult to get a variance <br />approved. <br />Gerhardson stated that the road is failing because of bad soils. Reconstruction of the road would <br />be necessary even if it were maintained at the current width which would be costly and then <br />MSA funds could not be used. <br />Tom Lane, 915 North Brown Road, e.xpressed his concern with the bike path being within 25’ <br />of his front door. He asked if the bike path were necessap^ to use MSA funds. Mayor Callahan <br />responded that the path would not b necessary but the City Council and Park Commission have <br />a policy for the location of bike paths throughout Orono. This is one of the recommended areas <br />and it is more economical to construct it at tlie same time as the road is upgraded. <br />Schroeder agreed that plans for the road are the minimum that can be achieved and still receive <br />MSA funds. He thought the bike path would be located closer to the road by the Lane <br />residence. <br />Carol Parrish, 1995 West Farm Road, had no problem with the road but was not excited about <br />the addition of the bike path. Mayor Callahan explained that the bike path will eventually <br />connect to other paths within the City connecting the Luce Line, schools and Baker Park.
The URL can be used to link to this page
Your browser does not support the video tag.