My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-25-1994 Council Packet
Orono
>
City Council
>
1994
>
07-25-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2023 9:50:04 AM
Creation date
12/11/2023 9:43:35 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
re{X)rt to evaluate the feasibility of <br />snue North of Carman Road. The <br />or more. The puipose of this report <br />id provide estimated project costs to <br />re permits from the Watershed and <br />d together over time as development <br />and don ’t seen to have a consistent <br />i annually and the street is impassible <br />onvenlence to the neighborho^ that <br />Avenue and Carman Road make it <br />unount of time. The proposal here <br />^er Kelly Avenue. The project would <br />Kelly Avenue in this area is only 1.5 <br />nnetonka. <br />utfall line as shown on Figure 1. <br />allowing Kelly Avenue from the Kelly <br />n a 20 foot deep excavation on Kelly <br />this option is that the work can be <br />^at follows the natural drainage way. <br />I some tree removal. The depth of <br />f the wetland area. <br />ulverts and drainage tile in the area, <br />e route. This option would require <br />^ater and assure positive drainage. <br />>ipe between the ponds. This option <br />loes option "C". This option utilizes <br />Detailed cost estimates of the proposed improv ements have been prepared and are included <br />in the Appendix. All prices are based on anticipated unit prices for the 1994 construction <br />season. Tbe total project costs include ten (10) percent for contingencies and thirty (30) <br />percent for engineering, legal, anticipated interest, and bonding costs. There are no costs <br />included for easement acquisition. The total estimated cost for the various options is as <br />follows: <br />Option A $81,290 <br />Option B $70,430 <br />Option C $66,140 <br />Option D $85,150 <br />Assi 11 lents <br />We would recommend that the project costs as outlined be charged to the benefitting <br />property owners based on benefit received. The benefit can be calculated on an area basis <br />of the property that has direct runoff to the drainage channel. The drainage area of <br />approximately 35 acres will benefit from the improvement. <br />Conclusions and Recommendations <br />The drainage improvements presented in this report are feasible as related to engineering <br />principals and construction practices. We would recommend option C because it minimizes <br />the impact on the neighborhood and it provides good Water Quality Management.impact <br />The following recommendations are presented for consideration by the City council: <br />That this report be adopt -tI t/*, the City of Orono as a guide for construction <br />of the proposed improve.' <br />That the City hold an information meeting with the neighborhood prior to <br />initiating the project. <br />That the City conduct a legal and fiscal review of the proposed project prior <br />to a public hearing. <br />That the cost of the improvements be allocated equally among the parcels in <br />the study area receiving benefit. <br />139/geo. rpl <br />N
The URL can be used to link to this page
Your browser does not support the video tag.