My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-11-1994 Council Packet
Orono
>
City Council
>
1994
>
07-11-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2023 9:23:06 AM
Creation date
12/11/2023 9:20:57 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
¥: <br />;p: <br />«• P*'3 <br />MINUTES OF TTne ORONO PLANNING COMMISSION MEETING <br />MARCH 21,1994 <br />(#7) #1911 ERNEST U man • coot.4 ^ <br />4* t.* <br />Lindquist opposed tn»irfng a deciskm on this request until the code (L: \utions were cleared up. <br />He that by the curxent code definidon. Pawl A is not a buildable lot and wanted <br />clarifkadon as to whether the visual or code definidon was to be applM to this property. He <br />felt this was different »han the previous applicadon because this subdivision application has not <br />been approved whereas the Vergeyle lot was already created. Mabusth aip^ with Liuilquist‘s <br />opinion and suggested ubling this applicadon until an amendment of the bluff unpact zone could <br />be considered or the Planning Commission could deny the current request. <br />Lemmennan expressed his fhistradon with the money he has spent only to find out now that the <br />lot is unbuUdable. Mabusth noisd that the lot could be buUt on at the lower elevations where <br />the original home was located but that is not what the applicant wants. The Council was also <br />unaware of any bluff impacts when they conceptually approved the lot line rearrangeinent. <br />Rowlette felt if the Planning Commission approved the lot line rearrangement that they in effect <br />approved the lot area variance at the same time and they should not be looking at this request <br />undl someone wants to build on the lot. <br />Mayor C'ilahan stated his under$ta4jding was that the lot line rearrangement came to the Council <br />with approval from the Planning Commission. However, staff felt another hearing would be <br />needed because Mr. Lemmerman needed to complete a formal plat rather than a simple metes <br />subdivision. The Lemmermans had to stop and go through a registradon. The <br />applicant did not want to proceed with the area variance when he found out how much money <br />if would cost so oroceeded with a lot line rearrangement to get conceptual approval. <br />Schroeder reviewed previous steps in the applicadon. With the topographic maps provided and <br />consideradon of the bluff impact zone, this lot would be considered unbuild^le without <br />varianLes for lot area and bluff impact zone. He asked if the Plannii^ Commission used the <br />visual top of bluff and approved the budding envelope if they would see an applicadon for actual <br />proposed constiuedon. Mabusth replied that performance standards exist for staff to work with <br />and if the setback is met, only staff would deal with a building applicadon. Schroeder noted for <br />that to hffpp*^". the Planning Commission would have to decide to use the visual top of bluff for <br />this aiqilindon. <br />Schroeder explained the bluff impact zone has been established to protect erosion from bluff <br />areas. Rowlette added that when hardcover and structure are added to a lot, mote runoff and <br />water exist and it moves faster.
The URL can be used to link to this page
Your browser does not support the video tag.