Laserfiche WebLink
SPEED LETTERFROM <br />^S> VAjg, ^on’f Mlhyi<L^ <br />list- of Tr/bu*fziKy <br />if* _ . c> PP«7^^Z^ <br />rno . <br />SIGNED. <br />•tKay <br />^'fhose. Tb <br />SIGNED. <br />tfOmNT: tCTAIN WMlTf CO^. RflURN .^.NK CO^' <br />/ <br />V. u 'i 3 <br />1.0+ ^ <br />Cxp <br />EM . F <br />// <br />- » <br />March 23, 1994 <br />GlTYofORONO <br />Municipal Offices <br />” y' <br />Street Address: <br />2750 Kelley Parkway <br />Orono. MN 553S6 <br />MaHins Address: <br />P.O. Box 66 <br />Crystal Bay. MN 55323 0066 <br />Ceil Strauss <br />Minnesota Department of Natural Resources <br />Metro Waters <br />1200 Warner Road <br />St. Paul, MN 55106 <br />RE: French Lake North Basin <br />Dear Ms. Strauss: <br />The DNR currently maps French Lake Marsh (27-140P) as three distinct basins, with three <br />different OHWs: <br />North Basil: <br />South Basin <br />Former Sewage Lagoon <br />930.5’ <br />930.0’ <br />934.3’ <br />As you know, prior to the City’s sltoreland ordinance review, the OHW for a number of lakes <br />in Orono including French Lake, had not been determined. In order to define a contour line for <br />measuring setbacks, the City used a portion of its shoreland grant monies to provide survey work <br />so the DNR could determine OHWs for these lakes. <br />Although the City did not and docs not contest the OHW elevation results, we do feel that the <br />elevation differences of the three French Lake basins, as well as their physical characteristics, <br />suggest that perhaps only the South Basin should be considered as a separate and distinct lake <br />for shoreland regulation purposes, and that the North Basin and Sewage Lagoon should be <br />considered as wetland basins. <br />This distinction is significant in its impact on properties surrounding the North Basin and Sewage <br />Lagoon. Previously, these propenies were only subject to wetland preservation and setback <br />requirements. Those requirements included: <br />• 26’ buffer outside perimeter of wetland, within which no filling, grading, <br />construction, etc. is allowable. <br />• 75 ’ setback from perimeter of wetland to septic system. <br />Teiepbone (612) 473-7357 • FAX 473-0510