My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-27-1994 Council Packet
Orono
>
City Council
>
1994
>
06-27-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2023 9:00:24 AM
Creation date
12/11/2023 8:54:08 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9. <br />10. <br />The City approves the interior trail plan tor the .second phase division of the <br />Coffin property allowing for the placement ot wood chips on existing grade not <br />to exceed a 5’\o 8’ width. This approval is based on the following findings: <br />A.No land alterations are proposed within the wetland or within 26’ of <br />wetlands. <br />B.The proposed trail design will have no impact on the existing wetlands nor <br />on their interaction. <br />C.Proposed trail will not impede surface runoff nor would it create down <br />stream Hooding or pollution problems. <br />The City has based preliminary’ approval ot this plat on the applicants engineer <br />and the City engineer’s reports and findings confirming that drainage from the <br />second phase residential development will not intensify drainage/Hooding of <br />down stream area. <br />NOW, THEREFORE, BE IT RESOLV'ED, that based upon one or more of the <br />findings noted above, the City Council of the City of Orono hereby approves the preliminary <br />plat applicant of Tandem Properties and the Peter Andrea Company per plat drawings by Mark <br />S.Gronbcrg. a licensed surveyor of Coffin and Gronberg. Inc., dated November 29. 1993. most <br />revised date May 25. 1994. subject to the following conditions: <br />1.Cul-de-sac roads on the Coffin and Dickey parcels within Phase 2 shall be <br />private. The City shall obtain underlying road and utility easements. The <br />developer shall create private covenants for the maintenance of private roads. <br />2.Applicants should also address the ownership of Outlot C and whether that shall <br />be a shared ownership. If not. then one owner shall be responsible for granting <br />an easement to the second owner. <br />3 Subdivider shall be responsible for installing pedestrian interior trails as shown <br />Oil trail plans drafted by .Mark Gronbcrg of Coffin and Gronbcrg. Inc. Interior <br />trail within the Coffin parcel shall be installed with wood chips placed on existing <br />iirade. <br />Paiie 3 of 7
The URL can be used to link to this page
Your browser does not support the video tag.