My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-23-1994 Council Packet
Orono
>
City Council
>
1994
>
05-23-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 3:58:22 PM
Creation date
12/8/2023 3:54:51 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Re: Bucey Project <br />MRS. BEVERLY SMERLING <br />2522 W. Lake of the Isles Parb^ay <br />Minneapolis, MN 55405 <br />May 23, 1994 <br />Orono City Council <br />Orono City Hall <br />2750 Kelley Parkway <br />Crystal Bay, MN 55323 <br />Ladies and gentleman: <br />As you know from Bob Mitchell’s letter to Mike Gaffron dated May 19, 1994, I continue <br />to be concerned about the Buceys ’ project. I attach a letter I received from Mark <br />Gronbcrg dated May 23, 1994. Please note the discrepancy Mr. Gronbcrg notes between <br />Bucey Exhibit B, Bucey Exhibit C and the hard-cover computation of 41.36% in ELxhibit <br />E-2. I believe the data should be internally consistent. Exhibit C is the correct depiction, <br />but the calculation is a little off. Apparently there is about sixty (60) square feet more of <br />hardcover. <br />Regarding the drainage issue, please note Mr. Gronberg’s concern that the south side <br />drainage swale extend far enough west to the 958-foot contour line, as shown on the <br />sketch attached to his letter. <br />Permit me to say that while I am aware of the hard work done by many people <br />concerned with the Bucey project, I still must state that I feel rushed and pressured to <br />respond to substantial issues in a quick turn-around time. I have done my best to hire <br />experts including Bob Mitchell, my attorney, Bruce Schmidt, my architect, and Mark <br />Gronbcrg, my surveyor. Nevertheless, I lived through the development of this same <br />property with the Holzers many years ago, and things did not turn out as well then as I <br />would have liked. I remain therefore worried that the drainage will somehow not work <br />out as well as is represented. I also worry that the large, new building and the hardcover <br />may cause an increased drainage problem. Notwithstanding my comments at the <br />planning commission meeting of October 16, 1993, made because I felt presstired and <br />because I was encouraged to compromise with the Buceys, 1 still feel their new house is <br />too large for their lot. I want to tell you these things because they are in my heart and in <br />my mind. <br />Obviously, 1 do not control the action you take, and yet it is incumbent upon me to <br />protect my property as best I can. I therefore tell you that if the drainage works out <br />improperly and to my disadvantage 1 will look to Orono as well as to the Buceys to <br />correct any shortcomings and any damage caused. Thank you for your consideration.
The URL can be used to link to this page
Your browser does not support the video tag.