My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-23-1994 Council Packet
Orono
>
City Council
>
1994
>
05-23-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 3:58:22 PM
Creation date
12/8/2023 3:54:51 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
rcninq File il2ll <br />April 21» 19B8 <br />Faqe 2 <br />5. Approxxritely 1.5 acres of dry ^• rmr«?ii" <br />the portion of Lot 8 ^ ^•code*Sactlon 10.03 Sybdlvislon • (■)» <br />ComBisslon P?_\ v«wav ease»ent only, and not a road <br />and felt that this J1 leavinq Lot 8 with substandard <br />would not^ r:.'5«'*^th“t‘"Ur’dl«. of th. drl««y <br />**■**■ J if ».re to rld.fli. th. ..tl.nd. in tot t, «•>•«■•*? • <br />.aasooBt, if e ,„t ‘, *ould contain l.aa than 2 .cr*. of dry <br />E°!liabi. land. Sine, that house 1. <br />not appear to significantly affect develop»ent of Lot 8. <br />Staff Recosiendation <br />s.ven th~ circu.,t.nc« that ^evelcpoent of . <br />of the wet.and "Pr””/"f'”*'’':;! “w*a„ o”r th. p^oATs'^ «..Ant o„ tot <br />.^Pd -ncouraoe « L<,h *11 but a short <br />:;cV:nt'’?.'fV- ’or “o7e “7ro:' the wetr.nd, .object to the followin, <br />conditions: <br />The .1 seaeents of culvert In poor 5°"'* ‘MSlT l"* bl*?MO«dJ^oasino near the boundary between Lot 7 and Lot 8, shall be re.oved <br />nnd r»»placed with a single 24 inch culvert. <br />b To the greatest degree possible, the sand fill shall be <br />^rem the area of the Unsuccessful criveway construction, and the <br />wetland allowed to return to its previous natural state. <br />C The driveway to be developed within Lot 7 shall be <br />avoid conflict'^with the approved primary and alternate drainfxeld <br />sites. <br />d Th. .xiatlnq oradlnd and f11 line parnit obtained by applicants <br />contractor shall remain in effect for the <br />construction of the newly proposed driveway. <br />.Shall call for a final site inspection of both driveway sites once tne <br />sand fill IS removed and the new culvert is placed. <br />Staff rocemrends approval p»»i the attached resolution.
The URL can be used to link to this page
Your browser does not support the video tag.