My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-23-1994 Council Packet
Orono
>
City Council
>
1994
>
05-23-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 3:58:22 PM
Creation date
12/8/2023 3:54:51 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
or o\ <br />m <br />CITY of ORONO <br />RESOUTION OF THE Cm’ COUNCIL <br />Nn 34 15 <br />14. The park dedication fee for the first phase subdivision of $77,351.00 shall be <br />adjusted to reflect the cost of construction of bike trail on east side of Old Crystal <br />Bay Road The estimated cost of constructing bike trail is $30,920 (1.546 x <br />$20.00 per foot). The area of the trail shall be determined by subdivider s <br />surveyor so that an additional reduction can be made to park dedication fee. <br />15 Applicant to execute Developer's Agreement to ensure all grading/draina^ <br />irnprovements and road improvements arc installed to City ’s satisfaction. No land <br />alterations can take place until erosion control is established and. septic siws <br />fenced and the City is in receipt of final grading and road plans. No <br />improvements can begin until City Engineer has approved all <br />alteration/improvement plans. A Letter of Credit must accompany a fully <br />executed Developer ’s Agreement written to 150% of the cost of the pioposed <br />road and site improvements. No building permits will be issued until all drain^e <br />facilities have been installed and approved and satisfactory road base completed. <br />16 Per DNR report of 2/17/94. the DNR must approve all plans and specificrUions <br />prior to any construction taking place. The following improvements will be <br />required by the DNR: <br />a. Cleaning/upgrading of existing ditch that runs along the Luce Line <br />adjacent to Coffin property. <br />b. Replacing existing 18" culvert which is in disrepair. Applicant proposes <br />12" culvert at north end and 18" at southern end. <br />c. Placing a new culvert under the horse trail in the area by the pond south <br />of the Dickey property. <br />d Install a second higher culvert through Luce Line adjacent to Coffin <br />property to act as an overflow and to also allow mimmal lowenng ot the <br />elevation of the Luce Line at this location providing applicants plans meet <br />the requirement that slope is no greater than 1%. <br />The following list of final submittals must be submitted to the <br />weeks prior to the regularly scheduled Council meeting on the second and fourth Mondays of <br />the month. These submittals are as follows: <br />Page 6 of 9
The URL can be used to link to this page
Your browser does not support the video tag.