Laserfiche WebLink
.. ^ <br />ALTERNATIVE 2 - FORCEMAIH * GRAVITY SYSTEM ^ <br />♦» •'4 <br />14* D.I.P. Forcemain 500 L.F.0 15 $ 7,500 <br />27" R.C.P 50 L.F.0 20 1,000 <br />Manhole 1 EACH 0 600 &600 <br />Lift Station LUMP SUM 40,000 <br />27" Concrete Apron 1 EACH 0 350 -350 <br />Jacking 50 L.F.0 100 -5,000 <br />Rip-Rap 4 C.Y.0 20 -80 <br />• <br />Tree Removal LUMP SUM 1,000 <br />Restoration LUMP SUM 1,500 <br />Contingencies <br />«0' <br />5,700 <br />Total Construction Cost $62,730 <br />Engineering, Legal i Administrative 6,270 <br />Total Project Cost •$69,000 <br />- 4 . <br />>*r ♦ S* .• * » • <br />• • * , • ^ a <br />• ^ . a •. %« • % <br />• • <br />fa— . • ••• • <br />- r* •. • •• - *S f ' <br />• .•• : w.”,