Laserfiche WebLink
• • <br />• • •'• #♦ <br />- s.,• • •' r <br />• •- *4 : *< <br />rOOTE A <br />" RLTEANATIVE 1 “ ALL GRAVITY SYSTEM • • ' <br />I % <br />■‘•I • <br />^•• • • % <br />t * *» * * • • • <br />-••-- -‘-.r <br />V <br />27" R.C.P. <br />27" Concrete Aprons <br />Manholes <br />Jacking <br />Rip-Rap <br />Dragline Excavation <br />Tree Removal <br />Restoration <br />670 L.F. ® 20 - <br />2 EACH 9 350 « <br />2 EACH 9 600 = <br />60 L.F. 0 125 <br />4 C.Y. @ 20 * <br />1,300 C.Y. § 2 - <br />lump sum <br />lump sum <br />Contingencies <br />Total Construction Cost <br />Engineering, Legal * Administrative <br />Total Project Cost <br />$13,400 <br />700 <br />1,200 <br />7.500 <br />80 <br />2,600 <br />1,000 <br />1.500 <br />2,800 <br />$30,780 <br />4,600 <br />$35,380 <br />. V .