Laserfiche WebLink
Tandem Pm . <br />March 25, 1994 <br />page 2 of 2 <br />(Dickey Property)/Bike Trail Update <br />Tte Brandenberg’s major concern is landscaping to replace the loss of the current trees in the <br />ditch area. The City Engineer is preparing a plan to show how the City ’s proposed additional <br />landscaping would wortc in conjunction with the landscaping currently existing outside of the <br />City right-of-way. <br />• <br />An additional benefit of phasing the trail is that the City may be able to install landscaping <br />several years in advance of the construction of the trail and removal of the existing trees <br />(particularly in the area of the Hiles and Brandenbergs). This would provkte an opportunity for <br />the new screening to develop prior to removing a portion of the existing screening. The City <br />Engineer is identifying the areas where this concept could work.