Laserfiche WebLink
15.Per DNR report of 2/17/94, the DNR must approve all plans arid specifications <br />prior to any construction taking place. The following improvements will l>e <br />required by the DNR: <br />a. Cleaning/upgrading of existing ditch that runs along the Luce Line <br />adjacent to Coffin property. <br />b. Replacing existing 18" culvert which is in disrepair. Applicant proposes <br />12" culvert at iwrth end and 18" at southern end. <br />c. Placing a new culvert under the horse trail in the area by tte pond south <br />of the Dickey property. <br />d. Install a second higher culvert through Luce Line adjacent to Coffin <br />property *o act as an overflow and to also allow minimal lowering of the <br />elevation of the Luce Line at this location providing applicants’ plans meet <br />the requirement that slope is no greater than 1%. <br />The following list of final submittals must be submitted to the Zomng Administrator two <br />weeks prior to the regularly scheduled Council meeting on the second and fourth Mondays of <br />the month. These submittals are as follows: <br />1.Record plat drawings in the form of three (3) mylar copies (with one copy for the <br />City’s records and two for filing with Hennepin County) and one (1) copy <br />reduced to 1" = 200’. Drawing to include: <br />A. Lot lines platted per preliminary survey by Mark S. Gronberg of Coffin <br />and Gronberg, Inc. dated 12-1-93, most revised date 3-3-94. <br />B. Dedication of "drainage and utility easements" as noted in Iteni 2 above. <br />C. Designation and dedication of drainage easements over detention areas <br />within both the Dickey and Coffin parcels. <br />D. Designation of private road as outlet and Countryside Drive as public <br />road. <br />Page 6 of 9