My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-14-1994 Council Packet
Orono
>
City Council
>
1994
>
03-14-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 1:27:51 PM
Creation date
12/8/2023 1:23:16 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
465
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Request for Council Action continued <br />page 9 of 10 <br />March 11. 1994 <br />Zoning File #1901 <br />shall grant easements over temporary cul-de-sac areas not located within 50’ road <br />right-of-way. Countryside Drive shall continue to be maintained by benefitting <br />private property owners until road is approved for public maintenance and <br />constructed as a through way. Both cul-de-sac roads on Coffin property shall be <br />private. City shall obtain underlying road and utility easements. Developer shall <br />develop private covenants for the maintenance of private roads as well as the <br />public road to be maintained by private property owners. <br />2. Dedication of drainage and utility easements 5 ’ along all interior lot lines and a <br />10’ along the perimeter boundaries and adjacent road right-of-ways. <br />3. Prior to anv site improvements, erosion control as shown on preliminary grading <br />and drainage plans must be installed and maintained until natural ground cover <br />is restored. <br />4. Prior to site grading improvements, all tested septic sites on the Coffin property <br />must be fenced all and the following lots in the first phase development of the <br />Dickey property must be fenced oft: Lots 1, 2, 3, 4, 5 and 6, Block 1 and Lots <br />3, 4, 5, 6 and 7, Block 2. <br />5. Drainfields to be moved 5* to east within Lots 1 and 3, Block I to allow for <br />adequate separation from bike trail. <br />6. Applicant to grant trail easement over Old Crystal Bay Road bike trail along <br />western boundary of Dickey parcel. <br />7. Well pit must be sealed within Lot 2, Block 2 of the Dickey property. <br />8. All wetlands designated on City conservation maps shall be shown as drainage <br />easements on the plat. There are no designated wetlands within the Dickey <br />property. Lots 1, 2, 7, 8 and 9 of the first phase division of the Coffin property <br />have protected wetlands. <br />9. Park outlot remain as park whether there is historical significance or not within <br />the property and that internal trails linking park outlot to DNR parks and <br />eventually to Luce Line be dedicated as public. Applicant’s surveyor must <br />exclude interior trail areas from lot areas of each lot. <br />10. Drainage easement shall be acquired over all retention ponding areas. Such <br />easements to be recorded in the chain of title. Developer shall create covenants
The URL can be used to link to this page
Your browser does not support the video tag.