My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-14-1994 Council Packet
Orono
>
City Council
>
1994
>
02-14-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 12:59:23 PM
Creation date
12/8/2023 12:52:28 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Orooo Public Works Dqjartment <br />Project No. CMKX-93-0163 <br />January 28. 1994 <br />Pase4 <br />Based on the field headspaa reults observed during drilling of the boring conducted , <br />south of the former 3,000-gallon unleaded gasoline UST, Braun Intertw mzy or may <br />not install a monitoring well at this location. If soil screening results indicate soil <br />fi^nntaminatinn at this location, the boring will be completed as an above-grade <br />monitoring well. If no signs of contaminatioc are exhibited, a well will not be installed <br />in this boring, per MPCA verbal suggestion. Three above-grade monitoring wells will <br />be installed in the remaining three soU borings which will surround the location of the <br />former 560-gallon di«el fuel UST. For cost estimating purpose, it is assumed that four <br />monitoring well wUl be installed at this site. Please sec Figure 3 in Appendix A for the <br />proposed monitoring well locations (MW-1 through MW-4). <br />The monitoring welts will be developed by a Braun Intertec field technician. <br />A foil round of water level measurements will be collected following development of <br />the monitoring wells. <br />In-sini hydraulic conductivity tests will be conducted by Braun Intertec field personnel <br />in two of the monitoring wells. <br />The monitoring wells will be sampled after water levels have been obtained and again <br />in approximately three months. The monitoring well which may be placed south <br />(presumed downgradient) of the unleaded UST basin wfll be analyzed for volatile <br />organic compounds (VOCs) and GRO for the first round, and assuming no non <br />petroleum related VOCs are detected. BETX and GRO the second round. The <br />monitoring wells placed around the fuel oil UST basin will be analyzed for (VOCs) ami <br />DRO for the first round, and assuming no non-petrclrom related VOCs are deteaed, <br />BETX and DRO for the second round. A bailer blank will also be colleaed during <br />both sampling events and will be analyzed for VOCs during the first round and BETX <br />for the second round. <br />Following completion of the remedial investigation, Braun Intertec will prepare a <br />Remedial Investigation/Corrective Action Design Report in accordance with MPCA <br />guidelines. The costs for the corrective aaion design assumes a groundwyter <br />monitoring or no action alternative. If corrective action involving active remediation <br />systems (e.g., soil venting, groundwater pumping and treating, bioremediatlon, etc.) are <br />necessary, Braun Intertec will prepare a Comprehensive Corrective Action Plan <br />(CCAP) based upon the listed unit costs.
The URL can be used to link to this page
Your browser does not support the video tag.