My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-16-1988 Planning Packet
Orono
>
Planning Commission
>
1988
>
05-16-1988 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 12:36:58 PM
Creation date
12/7/2023 3:02:17 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 3 - Big Island Veterans CampGeneral Land Use Applicationneeded after opening. An extensive beaching area is also available to the west of the site of the present dock. <br />Boat storage of camp boats during the summer <br />perLnent Ilips. or in case of fishing <br />the existing dock site. Winter storage will be dry stacking <br />near the belch with larger boats, such as the pontoon, beached <br />at the dock area. <br />Proposed overnight camping density for <br />tiec! is fiftv-seven (57). Proposed density for day <br />caS^S during 19Pr is one hundred fifty (150) with one hundred <br />MOO) Ll^ed for overnight cent camping. Events involving <br />ia?ge nurSrs of attendees (eg. 500) would be subject to a <br />separate request for an event permit. <br />A license will be required to allow for sale of soft drinks <br />and other like packaged goods by the caretaker. <br />Site Plan Narrative <br />Cleanup and renovation activities will cover most of the island, <br />Soweve? nLr-?erm day and tent camping will be focused on the <br />SoTnrchaJ^ng aJL. Renovation and refurbishment of existing <br />latrines at Point Charming and the Peanut Row area are y <br />priority. <br />Tent areas of approved design and layout will be established <br />at Point Charming. <br />The beach area utilized for Point Charming would be the beach <br />(di'"0ctly east of Point Charming* <br />The overnight cabin accomodation in this phase will be the <br />caretaker* t' cabin. <br />Picnic and coolcing activities will be centralized at Point <br />Charming in this phase. <br />Docks will be constructed in the current location subject to <br />Orono and CMCD approval. <br />No specific formal recreational areas will be designated in <br />this phase. <br />Latrines at Point Charming and Peanut Row <br />serially with a minimum of one required to be operational for <br />camp opening. <br />Future Plans <br />The overall objectives of the Camp is to renovate for permanent <br />retention the following buildings: <br />....•; <br />.A \ <br />L '-ft (■ <br />f <br />! yfi-' <br />Mm-■m^ri <br />mm <br />;vp3SM <br />%aii i'i <br />mm. <br />mX'Kg <br />mmMMmmm:) <br />Imrnmm <br />mm <br />m:mv <br />■■ ■ 3 ..3;' '.'v- ■■>>: - • <br />'•V -'.-4 - :> :.-: y <br />■■:. . ■ '^ • <br />■■ J- -• <br />■ <br />iumirn <br />Pi 9i <br />Sa^pii <br />K <br />•> -3' .-.V:,.: <br />liS <br />■'•j'iS'.'W <br />F ' - <br />A m.1: .5 <br />mm <br />.. v.o > ., .. <br />■: V <br />->:mA <br />■• •3-. m'rn:- .:. ; <br />fc;::
The URL can be used to link to this page
Your browser does not support the video tag.