My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-16-1988 Planning Packet
Orono
>
Planning Commission
>
1988
>
05-16-1988 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 12:36:58 PM
Creation date
12/7/2023 3:02:17 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
rnment <br />td <br />LP <br />sncing <br />Section <br />:e to <br />>uth <br />Lake <br />torth to <br />jccom- <br />low camp <br />s over <br />lie 1988. <br />upleting <br />a to day <br />B pre- <br />B camp to <br />by <br />Bs for <br />Point <br />•■ym <br />' 4 <br />;|mm <br />yy^.yy'-y-::-^< <br />-.■■■ ■•:;•■ <br />mrnM^ <br />m::: y <br />- <br />: <br />i: U ■ V'' <br />ym^y^^y^fyrsrnyy^y <br />k| <br />r.i» <br />^ -V‘- v ^. ^V:*fPage 2 -Big Island Veterans Camp General Land Use Application-f> Xmi Mi e.f.Approval of water supply systems for use by oat5.ers and «>rkers. <br />h. <br />VX. <br />j. <br />k. <br />^nns <br />1. <br />If- :,•■ :.V-:.-'^v.,^.A. <br />;Hf i^!^' <br />^miytfHi <br />siting of picnic tables, crills. benches and other camp <br />furnishings at Point Charming. <br />continuation of brush cleaning required for establishing tent <br />camp sites* <br />construction of approved dock capable of supporting camp and <br />transient use. <br />Establishment of a helicopter landing area tor use by camp and <br />emergency response personnel. <br />Establishment of a fenced garbage consolidation area <br />securing to the satisfaction °£ 0^"° <br />or other areas considered hazardous. <br />Other Relevant Issues and Needs <br />;;ss;s !;r.KSr:.S.i‘".":srr.%;‘, <br />c. New construction and burn permits will be separate <br />from Orono. <br />rn!^7 ?^efer:i77arha7?e^irSf ’;i^kpe <br />S^^^^r^tio^s Ld Will pro^ to be -n^excellent^ <br />»58^""®'"le?eSoni%Srtered to supervise work <br />contractors as well as scheduling snd coordinatror <br />ties His presence on the Islana wixx <br />and inspection responsiveness. <br />All buildings will remain secured until approval 3 <br />their use. <br />con^ic latrine and water supply elements will re< <br />?Specao7 renovatlon and approval by Orono and : <br />inspectors. <br />A current certificate of insurance will be provid <br />T«, permanent slips will he.required for use by c <br />i: ^4-0 nrinr to camp re-opening. Approval ror six <br />^?pt fofcamp use and up to twenty transient sir <br />d. <br />■*.u <br />Pago 3 <br />m
The URL can be used to link to this page
Your browser does not support the video tag.