My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-20-1988 Planning Packet
Orono
>
Planning Commission
>
1988
>
06-20-1988 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 8:36:11 AM
Creation date
12/7/2023 1:47:39 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />m- <br />■TJ' * <br />: Jir <br />* 4 <br />4 <br />* > *■ I <br />' ' 1 I <br />?» / <br />> <br />■• ♦ <br />I ‘ <br />THE VOOT CORPORATION <br />ARCMITBCTURK ■NOINBBRINO <br />June 15, 1988 <br />Tom Jacobs, Bldg. Inspector <br />City of Orono <br />P.O. Box 66 <br />Crystal Bay, NN 55323 <br />Re: Washington Scientific Industries <br />Proposed Building Addition <br />Dear Mr* Jacobs: <br />Due to poor soil underlying the proposed building addition, it will be <br />advisable to excavate and replace soil to a depth of approximately 7' below <br />the floor. This will result in an excess of approximately 10,000 cu. yards <br />of fill to be disposed of. <br />Along the south 1200 feet of the west property line there is now a rather <br />abrupt slope where the grade drops down about 6' in a short horizontal <br />distance. This appears to us to be a logical location to place the excess <br />fill. The abrupt bank could be made into a more gentle slope and would <br />improve the drainage in the rear portion of the site, which is now poorly <br />drained. <br />Since you pointed out that this would require a conditional use permit, we <br />would like the City to know that WSI intends to apply for a conditional <br />use permit to do this grading. <br />Prior to approval of a conditional use permit the excavated earth would be <br />stockpiled at a location determined and approved by City staff and the <br />City Engineering Consultant. The extra earth could be removed from the <br />site entirely, but we believe that regrading the west edge of the rear area <br />of the site to a more gentle slope would be a good solution and would result <br />in improved drainage conditions. <br />Yours truly. <br />THE VOGT CORPORATION <br />Edward J. Vogt, A.I.A. <br />EJV/dj <br />cc: J.. Pallansch, WSI <br />JUNISIWWW <br />«. <br />t: <br />f 9 <br />4 ^ <br />r ■ <br />'/
The URL can be used to link to this page
Your browser does not support the video tag.