My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-21-1989 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1980-1989
>
1989 Planning Packets
>
08-21-1989 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2023 3:31:32 PM
Creation date
11/22/2023 12:23:12 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zoning File #1428 <br />August 17 r 1989 <br />Page 4 of 8 <br />C) Vacation of drainage easements over wetlands shown <br />as shields, silty clay loam formed within a low area of <br />the former vacant field but after farming there is no <br />sign of the previously defined wetland. Detention <br />ponds will be provided on the site to maintain and <br />treat surface run*>off before leaving the site. <br />Applicant will provide more detailed drainage and <br />hydraulic information at the time of the development <br />and final stage review. <br />Review Comments for the Concept Stage of the <br />comprehensive Land Use J^polication - <br />1. The PUD with underlying B-6 soning meets rhe planning <br />objectives of the Comprehensive Plan Amendment. The <br />proposed residential and PUD subdivision will require the <br />realignment of the residential zoning line approximately 75* <br />to tl.s north. <br />2. Applicant to dedicate 10' drainage and utility easement <br />along east lot line of Lot 2 extending to Outlot B. <br />3. The City will ask for 10* of additional right-of-way for <br />Highway 12 along the southern boundary (consistent with <br />Rebers' subdivision) and 7 additional feet for Willow Drive <br />along the western boundary. <br />4. Review Exhibit H, MnDot has denied the request by the <br />applicant for a direct access onto Highway 12 limited to <br />ingress only. Staff has contacted Hr. Benson of MnDot <br />asking would he allow a temporary access until a frontage <br />road is installed. MnDot has refused even a temporary use <br />of an access in light of the demaud for more safety on <br />Highway 12 and the desire of the State to complete the <br />proposed safety Improvements within the area limiting all <br />new curb cuts within that area. Mr. Benson has confirmed <br />that there are Federal and State funds available to pay up <br />to 50% the cost of a frontage road if the City plans to <br />proceed with such an Improvement. <br />5. Sanitary sewer and water improvements have been ordered by <br />the City and they will be located within the utility <br />easements along the southern portion of the property along <br />Highway 12 as shown on the plans. The final development <br />plans must show the location of sewer and water lines as <br />they serve the uses on the property, locating mains and fire <br />hydrants.
The URL can be used to link to this page
Your browser does not support the video tag.