My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-19-1989 Planning Packet
Orono
>
Planning Commission
>
1989
>
06-19-1989 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2023 12:02:27 PM
Creation date
11/16/2023 10:26:53 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
;s ;- -y V..'. ’'Si:|.f ^y-yy^mmrchlng the <br />>propriate <br />growth in <br />r need for <br />;he north. <br />Hunt Farm <br />of the 15 <br />a single <br />ransmltter <br />:ent power <br />lex (refer <br />id 65'xllO' <br />mately the <br />that the <br />.on. Both <br />g the site <br />that run <br />Id confirm <br />ition or if <br />ea, staff's <br />: upon the <br />following <br />>y the City <br />enslty) are <br />1 adjacent <br />use? What <br />ion use? <br />is located <br />uth side of <br />:lon can be <br />and noise <br />if this is <br />u ^ jt'^>v <br />wmern <br />[<£*¥> <br />’ ■ .' V'- V .:. '-i-'Lti <br />fe:s! V-.' <br />myry <br />* r-- .i. ■ <br />pi^i* <br />IftTi“:>Wify\\ - <br />'•■' '- -wlFmy y, <br />mm <br />^'.:VSVv?rv <br />mm <br />^r‘. <br />/ V .■■; . rw:v * ■ ■: :.- <br />...................... T^flBKniriliiTrnT • •' <br />^ mf - ■iile 'ii-^^teffi'-'v--ymmm <br />-A'.-V <br />,.»r 5 •• ■;"'•■'•! ; • ■• <br />mumg <br />»'></ • • <br />iX;:yr <br />m-myyy.ymyy <br />M, <br />,y.'0 <br />Zoning File #1417 June 14, 1989 Page 3 of 4B) Applicant can provide an earthen barrier to residences to south and west with following grading <br />options: <br />i. Final grades of proposed substation are <br />proposed at 978.3 on the east and 979 on the west. <br />Applicant can excavate area to 970 elevation and <br />use fill to create berms on west and south side of <br />station. OR <br />ii. Move substation eastward to 970 elevation. <br />Install substation westward of the 970 elevation, <br />excavating to the 970 elevation. Applicant is <br />advised of the 26' setback from the adjacent <br />wetland at approximately the 964 elevation. The <br />setback must be maintained during construction. <br />Bermlng can also be provided with the additional <br />fill resulting from the excavated material. <br />C) In.reviewing Exhibit K, the landscape plan, it <br />would appear that some of the existing trees are to be <br />removed with the Installation of the substructure. <br />Many of the existing plantings are mature trees. The <br />City would encourage the applicant to maintain as many <br />as possible of the existing plantings. To ensure the <br />visual barrier to the adjacent residential properties, <br />the earthen berms adjacent to the substation on the <br />west and south side can also be provided with <br />plantings. Applicant is to advise if this creates a <br />problem for the operation of the substation. <br />Staff has discussed the application with only one of the <br />affected property owners, representative of the developer of <br />Huntington Farm. As of this writing staff has received no <br />commentary or received any calls from other adjacent <br />residents. The applicant will have various technical <br />representatives at the meeting to answer any questions residences <br />or members of the Commission may have concerning the proposed <br />application. If the application meets with the approval of the <br />Commission, such approval should be conditioned on the following: <br />1. Applicant to obtain the appropriate permit from the City <br />of Orono for the proper abandonment of the residential well on the site. <br />2. Applicant to provide appropriate erosion control (silt <br />fencing) prior to the installation of the substation through <br />construction until ground cover is restored. <br />3. Bermlng to be provided along the south and west sides of <br />the substation. The City to enc urage evergreen plemtings <br />within the bwrmed area. <br />;•= N; ;.v. <br />•-li-ii'-’x • r'.. <br />m mmm:y
The URL can be used to link to this page
Your browser does not support the video tag.