My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-15-1993 Planning PacketC
Orono
>
Planning Commission
>
1993
>
11-15-1993 Planning PacketC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2023 11:38:10 AM
Creation date
11/2/2023 11:31:55 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MIM.TFS OF THE ORONO PLANNING CO.>LMIS5ION .MEETING <br />HELD OCTOBER IS. 1993 <br />(#3) #1874 GARY DESANTIS/SAILORS WORLD - CONT <br />hardcover noting that some off-site parking had been secured at the Minnetonka An Center. He <br />felt that it may be bener to take a couole parking spaces for placement of the storage structure <br />than to attempt to place them on a grassed area. <br />Peterson asked if the applicant was aware of DNR comments on this application. DeSantis was <br />not but they were included as pan of the original packet. <br />Nolan asked what the intended schedule of completion of improvements was for the property. <br />DeSantis responded that they had three years to complete the commercial site plan and that tune <br />has not e.xpurd. The rainy season this summer has caused problems completing the parking lot <br />and landscapmg. <br />DeSantis e.xplained that the structures are moveable with no foundations and could be considered <br />temporary' or permanent. <br />Nolan observed piles of lumber, a tractor, rotting timbers and a dumpster on the property and <br />questioned the standard practice of operation regarding use of these landscape areas. The City <br />has designated cenain areas yet Nolan noted most of these areas had some type of coverage on <br />them. i.c. boat, construction materials, etc. <br />DeSantis responded that the marina is in a winter storage mode and has the ability to use the <br />property for winter storage. Landscape limbers will be removed when the landscape contractor <br />has time to complete his work. <br />Smith asked if some of the items could be moved to clean up the property. DeSantis asked <br />where they should be moved to. Nolan added that was the point he was trying to make. Even <br />if the landscaping were complete, would there still be materials left in landscaped areas? Is this <br />the standard of operation the Planning Commission could expect to see in the future? <br />‘ DeSantis did not feel he should be criticized for not completing the improvements. Pan of the <br />landscaping price was removal of the old tunbers and the contractor has not completed that <br />portion. <br />Schroeder noted there were worthwhile improvements. The B-2 zone has been an issue for <br />consideration by the City for some time. He has concern over adding more hardcover in the <br />form of storage. He did not see renting storage space as part of the overall plan. He suggested <br />storage could occur across the street or on some other part of the property further fforn the late. <br />He also expressed concern that aesthetically the storage buildings would not be consistent with <br />the existing buildings. <br />■ rtWnaiiaH^rt-1 I ■iltiiaiii'ia I II I nTa^Tiiiii ^**-^ *-
The URL can be used to link to this page
Your browser does not support the video tag.