My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-15-1993 Planning PacketC
Orono
>
Planning Commission
>
1993
>
11-15-1993 Planning PacketC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2023 11:38:10 AM
Creation date
11/2/2023 11:31:55 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Jeanne Mabusth <br />November 5, 1993 <br />Page 2 <br />Upon further review of the approval for the three season porch, it has been advised ’.y our <br />builder and the City Inspector, Lyle, that the existing pole footings are not strong enough to <br />support any additional weight. The pole footings have moved out over the last ten years and the <br />joists are bowed. <br />Therefore, for clarification purposes we would like the City to be aware that the existing deck <br />needs to be removed and install stronger footings that the City recommends to support the new <br />structure. <br />Per your advice, 1 contacted Mr. Joe Richter of the DNR on November 4, 1993 to discuss this <br />issue. He informed me that per their approval dated July 23, 1993, they had no problem with <br />the removal as long as the new structure is not built any closer to the 929.4 water line. It would <br />be built in the exact location of the deck that was removed. <br />Weather Protective Porch/Qverhan <br />Since our back door does not have a protective entrance from the weather, we would like to <br />install a 3 ’-3 ’6" overhang that would run from our back aoor and tie in with our three season <br />porch. Please refer to diagram. This would not affect any hardcover as this would be over <br />the deck area. <br />Additional 250 square feet of New Deck <br />Please refer to design for changes that the Council allowed during the approval process, <br />We look forward to the City’s review' of these minor changes and the November 22 Council <br />meeting so we can proceed with construction. <br />Sinc^ely yours, <br />IjCJL(JU <br />'^om «& Sheila Browne <br />760 S. Brown Road <br />Orono, MN 55391
The URL can be used to link to this page
Your browser does not support the video tag.