My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-17-1994 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1990-1999
>
1994
>
10-17-1994 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2023 3:57:44 PM
Creation date
10/19/2023 3:20:41 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
415
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />Zoning File #1976 <br />October 7, 1994 <br />Page 2 <br />the public street IxH width at the Bayside lot line is only a 179’ at the 100' setback Lot 2 has <br />an unusual shape with an access corridor at Bayside at 237’. Refer to your prelm'inary’ plans, <br />note the typical lot and building envelope defined on that suncy is incorrect. This is a 5 acre <br />zone not 2 acre. The front aral rear setbacks arc 100* and the side 50’. Note proposed building <br />site shown on 2 dees not conform to required rear yard setback. Structure must t>e moved <br />60’ south to conform to the 100’ setback. <br />Staff has had preliminary discussions with Doug Mattson of the Hennepin County Department <br />of Transpi>rtation wh<» advises that they would approve accesses to both lots via Bayside Road <br />because McCulley Rtud receives far more traffic than County Road 84. Matts<>n once again <br />advised staff of the County ’s desire to have the City take over County Road 84. Membets may <br />remember in the early review of the K-P Properties subdivision to the immediate south, the City <br />did not intend to grant additional right-of-way for Bayside Riud. Mattson did advise of the <br />possibility of granting additional right-of-way at the intersection of County Road 84 and <br />McCulley for a future upgrading and defining of a turn lane onto McCulley Road. Staff also <br />reviewed the acces^-s to the proposed lots w ith the City linginccr. Gustafson would approve <br />access o.f of McCulley Road it future owner so des’rcs. Mattson as well as Gustafson report <br />that access to la)t 2 would have to be at the very western boundary at Bay side because of <br />IcK'ation of the crest of the hill. <br />Weekman’s memo. Exhibit E. confinns suitable scnls for on-site septic treatment areas. <br />Weekman’s memo did not note a need to stake off the tested septic sites, but City will ask that <br />the septic site'- be staked ott prior to any land alteration. There were wells on the sits friun the <br />previous ski ('peration. Applicant should provide a status report on whether the wells have been <br />apprtipriately sealed and if any are intended for future residential use. Wells located within Lot <br />1 have not been shown on preliminary plans. If a well is to be used, the Kveation must be shown <br />so that Weekrnan can confirm required 75’ setback. <br />A barn on Lot 2 has ntn been shown im the preliminary survey. The barn is old and should be <br />demolished as a cH>nditi(^n of subdivision approval. <br />Gustafson asked for detailed grading and drainage plans and development ot driveways to <br />building sites. These plans must be submitted upon application tor building permit for <br />engineer’s approval. Doug Mattson of Hennepin County DOT has advised that they will .submit <br />a letter before Planning Commission ’s public hearing. Members will receive copies either in <br />a later submittal or at your meeting. <br />The best way to visit this site is at the existing gravel driveway that currently serves proposed <br />l^l 2 at Bayside Road, review staff s sketch, F..xhibit F. Park and view the beautiful vistas to <br />the north.
The URL can be used to link to this page
Your browser does not support the video tag.