My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-17-1994 Planning Packet
Orono
>
Planning Commission
>
1994
>
10-17-1994 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2023 3:57:44 PM
Creation date
10/19/2023 3:20:41 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
415
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />CITYofORONO <br />Muttkipal l>mct5 <br />SUUt AMrtss: <br />Orvw 5535« <br />PO Boi 6tt <br />Crystat Bay. IfN &S323 OOM <br />Pat Wolfe <br />2871 Casco Point Road <br />Wayzaia, MN 55391 <br />Dear Mr. Wolfe; <br />The Citv is in receipt of the Property Owners List and Plat Map as part of the required <br />information needed to complete your after-the-fact variance application. As I noted earlier in <br />a phone message, your application is incomplete as we have never received a survey lixating <br />all improvements and the subject boathouse on the survey. An earlier survey by Otto X <br />Associates shows onlv residence structure and garage. No other improvements arc recorded. <br />If vour application is to be complete, the City must have a survey locating all <br />including the boathouse siructure and a hardcover inventor ’ as stated and shown in the hands it <br />information (enclosed is another application form that includes handout i^omation). Ihc <br />boathouse is considered a non-conlorming structure as it is located withm the 0-75 setbaJ^ All <br />non-conforming structures require approval of the City before stnicmral repairs can be made. <br />The deadline date for sulmittals for the February 22nd meeting (Tu^y) if <br />Hopefully vour surveyor will have completed the updated survey by the deadline. If no <br />deadline'for the March 21st meeting of the Planmng Commission would be February .5ih. <br />The Citv must be in receipt of a complete application by the March meeting ^ <br />Commission. As we arc dealing with an after-the-fact application, this matter must bv resolved <br />as sooi as possible. <br />Please contact my office if you have any questions pertaining to the directives noted above or <br />if you will have difficulty^ meeting the deadline of March meeting. <br />Sincerely, <br />' <br />Jeanne A. Mabusih <br />Building &. Zoning Administrator <br />JAM/lsv <br />Telephone (612) 473-7357 • FAX 473-0510
The URL can be used to link to this page
Your browser does not support the video tag.