My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-19-1994 Planning Packet
Orono
>
Planning Commission
>
1994
>
09-19-1994 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2023 3:28:31 PM
Creation date
10/19/2023 3:19:52 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0066 <br />I 0. 0\CITYofORONO <br />Municipal Offices <br />street Address: <br />2.’50 Kelley Parltv»3y <br />Orcno. WN 55355 <br />Mailing Address: <br />P 0 Bci 66 <br />Crystal Bay. MN 55323 0066 <br />January 26, 1994 <br />Pat Wolfe <br />2871 Casco Point Road <br />Wayzata. MN 55391 <br />Dear Mr. Wolfe: <br />The City is in receipt of the Property Owners List and Plat Map as pan of the required <br />information needed to complete your after-the-fact variance application. As I noted earlier in <br />a phone message, your application is incomplete as we have never received a survey locating <br />all improvements and the subject boathouse on the survey. An earlier sursey by Otto & <br />Associates shows only residence structure and garage. No other improvements are recorded. <br />If your application is*to be complete, the City must have a survey locatmg all improvements <br />including the boathouse structure and a hardcover inventory as stated and shown in the handout <br />information (enclosed is another application form that includes handout information). The <br />boathouse is considered a non-conforming structure as it is located within the 0-75 setback. All <br />non-conforming structures require approval of the City before strucmral repairs can be made. <br />The deadline date for subminals for the February 22nd meeting (Tuesday) is January 28, 1994. <br />Hopefully your surveyor will have completed the updated survey by the deadline. If not, the <br />deadline for the March 21st meeting of the Planning Commission would be February 25th. <br />The City must be in receipt of a complete application by the March meeting of the Planning <br />Commission. As we are dealing with an after-the-fact application, this matter must be resolved <br />as soon as possible. <br />Please conmct my office if you have any questions penaining to the directives noted above or <br />if you will have difficulty meeting the deadline of March meeting. <br />Sincerely, <br />Jeanne A. Mabustli <br />Building & Zoning Administrator <br />JAM/lsv <br />Telephone (612) 473-7357 • FAX 473-0510
The URL can be used to link to this page
Your browser does not support the video tag.