My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-18-1994 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1990-1999
>
1994
>
07-18-1994 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2023 3:38:54 PM
Creation date
10/18/2023 3:34:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />• 5 <br />Zoning FUe #1941 <br />July 15, 1994 <br />Page 4 <br />wooden sea wall was replaced with a steel wall and the channel linking the pond with the main <br />lake was dredged to provide navigable waters for boats stored at the shoreline of the pond. <br />In reviewing applicants’ addendum, it is almost impossible to understand how anyone could <br />purchase th.- property witliout knowing some of the history by reviewing the files and the 1986 <br />dredging resoiicon filed against the chain of title to the property. Clearly during the 1986 <br />review for Joseph Durda, the City had taken a formal position on the designation of the pond <br />bemg pan of the main lake. Unfortunately, this resolution was never filed as Mr. and Mrs. <br />Durda failed to execute the resolutions. <br />Review of Hardships, Exhibit B <br />1. The applicants note that 80% of the total property is unbuildable <br />The house was placed on the property in 1973 prior to current lakeshore setback <br />standards. <br />3. The majority of the house is located within the 0-75 ’ setback area. <br />4. The current proposal mvolves decreases within the 0-75 ’ and 75-250 setback area. <br />Issues for Consideration <br />1.Major hardcover reductions are proposed in the 75-250 ’ setback area but what of the 0- <br />75 ’? Staff would note that a 106.5 s.f. or .5% can also be reduced m the 0-75 as a <br />credit for the 1 1/2’ width of overhang against 3 ’ wide upper level balcony. <br />2.As already noted in applicants’ hardship statement, the majority of this <br />located in a "no build" area. Is it possible to relocate improvements within the 75-250 <br />setback? Note the entire home is located within the 0-75 ’ setback except for iwrtions o <br />the garage and now the new entry addition. The area of proposed hardcover <br />improvements are as follows: <br />a.309 s.f. or 1.3% of deck improvements within 0-75 ’ <br />b. Footprint of two story addition within 0-75 ’ setback area - 298 s.f. or <br />1.28%. <br />c. New entry addition and mud room within 75-250 ’ setback area results in <br />600 s.f. or 5.7%. <br />ft \ <br />I ,
The URL can be used to link to this page
Your browser does not support the video tag.