Laserfiche WebLink
*^-:*'y »-?. <br />Zoning File #1933 <br />June 16, 1994 <br />Page 5 <br />» <br />* <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />Dedication of drainage and utility easements 5’ along all interior lot Imes and 10 <br />along the perimeter boundaries and adjacent to road rights-of-way. <br />Prior to any site improvements within the second phase, erosion control as shown <br />on preliminary grading and drainage plans must be installed and maintained until <br />natural groundcover is restored. <br />Prior to site grading improvements, ail tested septic sites on <br />Dickey parcels must be fenced off. (exception Lots 16 and , P <br />Approval of interior trail plan for second phase of Coffin parcel. The Dickey <br />parcel involves the north lot line of Lot 13, second phase. <br />All wetlands designated on City conservation maps shall be sh^n as dramge <br />easements on the plat. Designated wetland within Lot 16 must be designated y <br />a drainage easement. <br />Drainaae easement shall be taken over all retention ponding areas and <br />drainageways. As in the first phase reviews, such easement shall <br />the cLin of Title and developer shall create covenants to define future <br />hleowL* association’s responsibility for upkeep and maintenance of all <br />drainage facilities. <br />Payment of a park dedication fee prior to final plat approval. <br />The following lots have been found to contain protected wetlands not designated <br />on the City’s conservation area maps: <br />Dickey parcel: Lots 8, 17, 18 and 19, B*°ck 2 <br />Coffin parcel: Lots 11. 12. U. 15. H and 20. Block 1 <br />The following lots shall have involvement with mitigation areas: <br />Dickey parcel: Lots 8. 9. 13. 16. 17. 18 and 19 Bl«k 2 <br />Coffin parcel: Lots 11. 12. 13. 15. 17 and 20. Block 1 <br />. .h. fir« subdivision the developer shall create covenants to be fil^ in <br />As properties advising fiiture owners of the <br />the Cham of Title specific areas and the need to first apply to the <br />r™r oT Tnl^" "e Shaha Creek Watershed District if any <br />im^ovements are proposed at some future date before obtaiiung necessary <br />permits from the City of Orono.