Laserfiche WebLink
r <br />Zoning Flic #1824 <br />May 11. 19<)4 <br />Page 2 of 5 <br />Section 10.22, Subdivision 2 - Review of hardcover <br />Q-75' setback area =» 7,720 s.f. <br />Existing * 2,510 s.f. or 32*7 <br />Proposed * 1,494 s.f. or 1951 <br />75 250’ setback area » 8.245 s.f (area adjustments have reduced the setback <br />area from original estimated at 9.250 s.f. having impact on hardcover <br />facts) <br />Allowed - 2.001 s.f. or 25^ <br />Existing = 3.423 s.f.*’ or 41.5% <br />Proposed = 3.648 s.f.*‘ or 44.2% (addition of 57 s.f. overhang) <br />Increase in hardcover =» 225 s.f. or 2.7% <br />*’ Original existing = 2.917 s.f. or 35.3% <br />** Original proposed = 3.804 s.f. or 46.1% <br />4. Secti^m 10.56. Subdivision 16 (C) (2) - Se»’ kv v .-iances from top of bluff. <br />A.Garage addition <br />Required = 30 ’ <br />Existing * 35’ <br />Proposed = 20 ’ <br />B Overhang <br />Existing = 15’ <br />Proposed = 8’ <br />C.PriiKipal structure addition at lakeside <br />Existing = 18.8’ <br />Proposed = 12’ <br />Deck <br />Existing = 16.5’ <br />Proposed =6.5’ <br />List of Exhibifs <br />A - Certificate of Survey <br />B - Tojiographic Survey <br />C-1-2 Lot Coverage Facts