Laserfiche WebLink
Zoning File 11 SSI <br />April 15. 1994 <br />Page 3 <br />• Nfethods to minimize soil crosk)H and to trap sediments hefi>rr they reach any <br />surface water feature must be used. <br />• Altered areas must be subilized to acceptable erosn>n control standards. <br />. Fill or excavated material must not be placed in a manner that creates an unstable <br />slope. <br />• Plans to place fill or excasated materia* m steep slopes must be reviewed by the <br />City Engineer for continued slope subility and must not create tmished slopes ot <br />30^ or greater. O0% is approximately a 3; I slope). <br />• Fill or excavated material must not be placed in blutf impact zoiks (not a facior <br />here). <br />• Any alterations below the OHW of public waters must be authorized by the DNR <br />(DNR has confirmed no permit required). <br />• Alterations of topography must only be allowed if they are accessory to permitted <br />or coixlitional uses and do not adverse;, affect adjacent or nearby property. <br />It appears that with the revision of slopes to 3:1 at the crossing point, these standards and <br />conditions can be met. Staff would anticipate that in order to construct 3:1 slopes, the crossing <br />may have to shift 5-10 ’ westward to avoid filling into the neighboring property to the east. <br />Staff Recommendation <br />Staff recommends approval of the conditional use permit and variance for crossing the <br />creek A sueaested hardship for the variance request is that the rear ot applicants ’ property <br />cannot be suitably maintained and he has little use of that propeny without access to it. <br />Conditions ot approval should include. <br />1 Applicant to obtain a land alteration permit from the City prior to commencing <br />construction. <br />Construction on the driveway and crossing may not commence until the <br />Minnehaha Creek Watershed District has issued a permit. <br />3. <br />4. <br />Plan must be revised to include 3:1 tmished slo()es rather than 2.1 slopes. <br />Appropriate erosion control and site protection measures (i.e. "Best Management <br />Practices") shall be maintained during all phases of construction.