My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-23-1995 Council Packet
Orono
>
City Council
>
1995
>
10-23-1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 2:07:26 PM
Creation date
10/6/2023 2:04:20 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Request for Council Action continued <br />page 2 <br />October 17,1995 <br />Zoning File #1820 Hennepin Count>’ Department of En\-ironmental Management North /\rm Access <br />necessary rerairs subject to the condition that the land use application would be tiled betore the <br />required building permit could be issued by the Orono staff. A conditional use permit application <br />was filed and a building pcrmil issued. The repairs took place the week of April 19, 1993. <br />Review E.\hibit K, the Planning Commission recommended approval of the conditional use permit <br />at their May, 1993 meeting. Members asked that the Count>’ address the issue of stormwater <br />management as the quality of runoff draining directly to the lake from the parking lot was ot major <br />concern. <br />Mr. Bailey asked that the application be tabled at Council ’s June meeting until the County could <br />provide a stormwater plan and provide the necessar>’ funding. <br />Review E.xhibits K, M and N, the Cit> is finally in receipt of an amended grading and drainage plan <br />providing three sedimentation infiltration areas with a series of french drains conveying drainage to <br />the retention area. The plan also includes improvements to shoreline fishing areas to be installed in <br />accordance with the Americans with Disabilities Act. <br />BoJ' »he DNR and the applicant hav e joined forces to develop a stomiwater that would address the <br />ecological concerns of the City. As Mr. McDonough of tlie DNR notes in his letter (Exhibit M), the <br />County and DNR completed a similar improvement adjacent to Coffee chai.a^l. <br />The retention areas shall be planted with native grasses and trees will be planted along the shoreline <br />providing shade for the fisherman. The trees and native grasses will provide buffers to the blacktop <br />parking area of views from the lake. <br />Gustafson has approv ed the concept plan and asks that a maintenance schedule be established by the <br />County to maintain the three sediment infiltration iireas tind geo-te.xtile fabric within the french dram <br />to ensure against the flooding and damage to the surrounding vegetation. <br />The enclosed resolution has been drafted to include conditions set forth in the Engineer's report and <br />with a reference to the amended grading and drainage plan submitted by both the DNR and the <br />County Depanment ol' Environmental Manaitenient. <br />COUNCIL ACTION REQI F.STI I): <br />To approve or amend the enclosed resolution. <br />Isv
The URL can be used to link to this page
Your browser does not support the video tag.