My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-25-1995 Council Packet
Orono
>
City Council
>
1995
>
09-25-1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 1:18:13 PM
Creation date
10/6/2023 1:14:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NfINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON AUGUST 21, 1995 <br />(#15 - #2057 James Nystrom - Continued) ” <br />‘>PPli«'io". dray Ihe proposal, or <br />PP 0 e the proposal with an amendment moving all structure out ohhe 75' area The <br />app leant suggested amending the application to move the structure and deck back 10*. <br />Lindquist m^. Smith seconded, to approve Application «057 isith the stipulation that <br />all structure be moved back out of the 0-75’ setback zone. Ayes 6, Nays 0 <br />SIIADYWOOD ROAD - <br />COMMERCUL SITE PLAN/V ARIANCE - PUBLiC HEARING 11:22-l 1:55 P.M. <br />The Certificate ot Mailing and Affidavit of Publication were noted <br />The applicant and contractors, Keith Waters and Blake Bichanich, wwere present. <br />Mabusth report^ that the proposal is for a commercial office building just south of the <br />“Rd"'lfw A “P ^ '“»• -''o“f^icht CoRd 19 with a -50 frontage and zoned B-4 commercial The other lot to the rear <br />sindrort-”t'"'i f Tk ran'Wned. and asmgle oflice building would be erected to house a national office center for Autografs. Inc. <br />’’"’’’T' °*'P"‘'i"S ^™lable to what actual usage is <br />sol^l whh expansion if needed. The goal is to maintain open <br />. pate with plantinp It is the applicant's desire to protect the wooded, treed area. There <br />IS a provision lor future parking with the current plans <br />Jena^Ti'r K 'a c ^PP'^'-'rat Would like to know if there is an ability to <br />expand the building and parking into the residenti.il zoned area in the future if needed <br />Retaining ponds would be located on the propertv with drainage foi the initial building a.nd <br />expansion proposed to dram into the pond It would be connected with a 12" culvert aji <br />drainage will be direcaed away from Kelley Avenue and to the east under County Road <br />Ron Ramz relayed the background on the use 1 he building would he a corporate office <br />^d graphic design center using ,1M technology. The company is creating a^arketplace <br />tor the technology The computer work and production would be perfomied on the <br />prernises to include a printing area that would create the graphics thru computers that <br />would go out to kiosks wiihm car dealerships nationwide The location was chosen due to <br />neimess to j.M ind Rantz home The number of en.plovees would be limited The <br />technology requires a controlled environment of temperature and humiditv for the printing <br />process R.intz reported that there would be no chemical concerns as there is notllw <br />toxic within the toners used The product is the same as that used in lazer toners The <br />process electrostatically teeds oft ol the humidity and air. People are able to remain in the <br />room throughout the process with no personal harm. <br />23
The URL can be used to link to this page
Your browser does not support the video tag.