My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-25-1995 Council Packet
Orono
>
City Council
>
1995
>
09-25-1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 1:18:13 PM
Creation date
10/6/2023 1:14:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0^ <br />TO: <br />FROM: <br />DATE: <br />Mayor and City Council <br />Ron Moorsc, City Administrator <br />September 22, 1995 <br />SUBJECT: Council Update <br />1. <br />2. <br />IPetro Fund reimbursement for fuel leak clean-up at old City Hall site. The City has <br />received reimbursement from the Petro Fund in the amount of $30,418.81 as the first and <br />largest installment of the reimbursement for the city ’s costs related to the clean up of the <br />underground fuel storace tanks at the old City Hall. There is additional work to be done <br />and expenses to be incurred related to the monitoring wells on the site. When this work <br />is completed a follow-up application for additional reimbursement will be made to the <br />petro fund. <br />Water plant rehabilitation report. The city has received ami reviewed the preliminar> <br />report regarding the rehabilitation of the city ’s water plant. The report includes several <br />suggestions for operational changes to improve the functioning of the plant. The report <br />also identifies the major areas needing rehabilitation. <br />The two main components of the water plant are the iron removal system and water <br />softening system. The iron removal filter unit is potentially the most expensive, <br />depending on the condition of its various internal components which have not yet been <br />inspected" Bonestroo will provide a plan for investigating the condition of the various <br />components of the iron removal filter unit. <br />Although the water softening unit does not require expensive repairs, there are problem <br />areas related to the water softening process. One problem is that a large amount of water <br />is flushed into the sanitary sewer as part of the water softening cycle. This is a <br />significant expease to the city. Also, although the city softens the water many residents <br />also have water softeners in their homes. This .-ises wo issues; <br />1 ) When both the city and the residents soften water the water acmally gets too soft <br />which causes the water to dissolve copper from th^ residential water lines causing <br />a problem with the amount of copper in residential drinking water. <br />2.) If a majority of the city ’s water customers are using water softeners, the city ’s <br />water softening may be redundant. <br />A survey of the city ’s water customers is currently underway to detennine how many <br />homes have water softeners. This survey will provide infonnation to assi.st in <br />determining whether the city should stay in the water softening business, or in
The URL can be used to link to this page
Your browser does not support the video tag.