My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-11-1995 Council Packet
Orono
>
City Council
>
1995
>
09-11-1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 12:48:21 PM
Creation date
10/6/2023 12:43:13 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
•IKY TO <br />AncoTieM o* <br />DEPARTMENT OF THE ARMY <br />rr. ^Au. wwwu. coNM or emommw <br />AAMv conrs Of CNQNCcns cCNTue <br />laonrrNSTKCTCAST <br />ST »AULMNHICt-i>39 <br />-July 31. 1995 <br />Construction-Operations <br />Regulatory (94-02434-SF-JJY) <br />Mr. Mark Cronberg <br />Coffin & Cronberg <br />482 Tamarack Avenue <br />Long Lake, Minnesota 55356 <br />Dear Mr. Cronberg: <br />We have reviewed-the Inforoatlon you. provided about_a proposal by Sharon <br />and Wally Carson to construct a pond on lot 1. block 3 of the Old Crystal Bay <br />Road Second Addition (also called the Oickey-Coffin site in some of our <br />correspondence) The development was originally authorized, with special <br />conditions, under a nationwide general permit. The project sice is in Sec. 4, <br />T.117 N., R. 23 U., City of Orono. Hennepin County, Minnesota, <br />The original development has already affected 1.76 acres of wetland. <br />The present proposal would excavate about 0.38 acre and might affect <br />approximately 1 acre of wetland. <br />As you have discussed with Mr. Joseph Yanta of the Regulatory Branch, <br />this work may be eligible for authorization under the same nationwide general <br />permit, although the proposal requires Interagency review to determine whether <br />an individual permit may be necessary. The interagency review may cake <br />approximately 30 days. An individual permit review may take an additional 90 <br />CO 120 days or more. We cannot predict the result of this review or our <br />determination. A particular concern might be the potential drainage effect of <br />the excavated pond on the remainder of the approximately l-acra wetland. <br />It is possible that the excavation might not be authorized, but it is also <br />possible that it may be authorized, perhaps with special conditions, which may <br />Include compcnsaLiory mitigation to replace the affected . .land. <br />Please let us know if you wish us to proceed with the interagency review <br />of this proposal or if you wish to provide additional information about Cha <br />proposed pond. Because an Interagency site visit may help resolve some of the <br />potential concerns, v« will help arrange such a visit, if you wish. <br />If you have any questions,, contact Mr. Joseph Yanta at (612) 290-5361.
The URL can be used to link to this page
Your browser does not support the video tag.