Laserfiche WebLink
MINUTES OF THE REGULAR ORONO CITV COUNCIL MEETING HELD ON AUGUST 14,1995 <br />(#7 • Doug Olson • Continued) <br />The ^)plication is for removal of existing concrete patio and replaced with interi^king <br />blocks in sand rquhii^ in 65 s.f. less hardcover. The applicant would like to maintain <br />walkway to the dock Tte Planning Commission recommended approv’al of the <br />proposal by 3 of 4 total votes. The one Commissioner felt the stepping pads to the dock <br />were needed. Mabusth noted that the property is 24* from the 929.4 elevation <br />requiring a setback variance for the replacement. The application involves replacement ot <br />non-structural for non-structural with 170 s.f smaller area. The decking width is 9 and <br />remains the same. <br />Dr. Olson said there has beeri talk of remodeling. The goal now is for repair and time to <br />see bow it works. Olson asked the stepping stones remain to the dock due to the large <br />goose population <br />Jabbour said he appreciated the hardcover removal that has taken place and asked tor <br />consideration in the car parking area. <br />Hurr inquired of the two docks. One dock is used for the boat with canopy in the lagoon <br />area. The other 15’ dock is the swimming area. <br />Kelley moved. Goetten seconded, to approve Resolution #3589 <br />Callahan remarked on the variance based on a possible remodeling when that may not <br />occur The City may re-evaluate the paving w hen lunher changes are made. Olson <br />responded that he would like to change me blacktop area but needed to see whether the <br />house was a good fit for his family Ayes 5, Nays 0 <br />MAYOR/COUNCIL REPORT <br />Hurr left the meeting at this time. <br />Jabbour reported on the LMCD meetings recently attended. xMoorse had presented <br />Orono’s concerns to the LMCD regarding their budget. No questions were answered as <br />no board members with detailed knowledge of the budget were in attendance. <br />Harvesting of curasian milfoil was discussed but to no tiirther conclusion. <br />ENGINEER REPORT <br />(•#8) rflANGE ORDER nl (COMPLETION DATE) LIFf STATION HI <br />Goetten moved, Hurr seconded, to approve the Change Order #1 for Lift Station #7, <br />which extends the completion date of the projea to October 31, 1995. Ayes 5, Nays 0.