My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-24-1995 Council Packet
Orono
>
City Council
>
1995
>
04-24-1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 9:28:31 AM
Creation date
10/6/2023 9:24:00 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TO: <br />FROM: <br />Ron Moorse, City Adminisiraior <br />John Gerhardson, Public Works Director <br />DATE:April 19, 1995 <br />SUBJECT: Kelly Avenue Drainage <br />As you are aware, the City Engineer and I have been reviewing the drainage probleui on Kelly <br />Avenue. Several options have been looked at to resolve the problem and we have come to the <br />conclusion that the least expensive option (a lift station) would be the best alternative. <br />When Glenn and I decided on the best alternative, we presented the plan to the neighborhood <br />along with a plan for funding the project. The proposed funding plan would be to assess <br />commercial properties twice the amount as residential. The rationale being that commercial <br />properties have more hardcover, therefore they should pay more. The neighbors objected to any <br />project that would create an assessment to them. <br />Glenn and I feel that the project should proceed and to conduct an assessment hearing to <br />determine the number of appeals to see if it would be appropriate to proceed. <br />Attached for Council review is a breakdown of costs and the assessment options. The only item <br />on the attached list that would be assessed would be the cost for the construction of a lift station. <br />The sanitary sewer line repair/replacement would be funded from the sewer operating fund and <br />the street construction/restoration would be funded from the maintenance budget for 1995.
The URL can be used to link to this page
Your browser does not support the video tag.