My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-18-1994 Planning Packet
Orono
>
Planning Commission
>
1994
>
01-18-1994 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 1:52:55 PM
Creation date
10/5/2023 1:49:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Zoning File #1894 <br />January 10, 1994 <br />Page 3 <br />Further Issues for Consideration Dealing with Conditional Use Permit for Antenna <br />Structure <br />1.The City has received no information on the Installation of the strucnire. The <br />City must be in receipt of the detail and specifications for tower and base <br />strucnire for the review of the City Ei.j,. icer. It is difficult for staff to imagine <br />any reliable installer completing the insta* -non of the antenna strucnire without <br />a building permit. <br />As the structure is owned and used by a nonowner of the property, it will be <br />necessary to limit the conditional use permit to the specific user and require the <br />removal of the base and tower strucnire when applicant no longer resides on the <br />property. Are there other controls members may feel appropriate for use of the <br />structure? <br />L
The URL can be used to link to this page
Your browser does not support the video tag.