My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-22-1994 Planning Packet
Orono
>
Planning Commission
>
1994
>
02-22-1994 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 1:51:34 PM
Creation date
10/5/2023 1:48:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />O O <br />^ ^ » I « mm <br />>• <br />CITYof ORON <br />by the Wayzata Country Club. <br />6. Dedication to the City of Flowage and <br />Easements providing for limitations on the use <br />and drainageways described therein and shown on the plat as <br />drainage easements. <br />7. Ei-7cution of a subdivid.rs' aqreenent ’=^5 <br />installation of certain credit-subdivision approval and the posting of a letter of credit <br />at 150% of actual cost of required improvements. <br />8. Payment to the City of a Parle Dedication Fee in the <br />amount of $10r200.00. <br />9. Pavment to the City for the legal review and ot <br />the plat easements and covenants in the amount of $150.00. <br />NOW, THEREFORE, BE IT RESOLVED that the City Council of <br />the City of Orono hereby approves the plat of Fairway <br />Addition, Hennepin County, Minnesota; subject to the following <br />condition: <br />1. Permits for residential construction on both Lots 1 and <br />2 shall be issued by the City of Orono. Sewer and water <br />permits shall be issued by the City for both Lots ^ <br />The billing for sewer and water usage shall be the <br />responsibility of the City of Orono. Lot 2 has received <br />credi? of the previously assessed water and sewer unit <br />charges againthe property. Based on <br />scheduled, a sewer connection charge for Lot 1 is $7,22 . <br />and a water connection charge is $3,531.18. <br />2 Building permits will not be Issued for new construction <br />until utilities are installed and the access road has been <br />approved by the City Engineer for safe use by municipal <br />inspection vehicles• <br />3 Final utility and road construction plans must be <br />approved by the City prior to installation. <br />4. The subdividers and future owners are hereby advised <br />j»nv aranting of access easements involving Lot 2 may <br />decrease the two^acres in area of dry contiguous lands and <br />that the existing standards of the RR-IB zoning district <br />shall be effective even though municipal service has been <br />provided to Lot 2. <br />Page 2 of 3 <br />RESOLUTION OF THE CITY COUNCIL <br />NO. ^
The URL can be used to link to this page
Your browser does not support the video tag.