My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-20-1995 Planning Packet
Orono
>
Planning Commission
>
1995
>
11-20-1995 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 10:44:03 AM
Creation date
10/5/2023 8:44:35 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
433
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Zoning File #2059 <br />September 15, 1995 <br />Page 3 <br />•• V <br />' 2. <br />3. <br />City Engineer ’s Comments <br />Citv Ensineer Shawn Gustafson of Bonesiroo and Associates is in the unique posUion of also <br />beine the Citv Engineer for Medina. In that capacity, he has rwponded to Medina s many <br />^ 'a- thi. Kicic and need for the Dccr Hill Road project, the location, as well asconcerns regardmg the basis and need tor me uccr nm f j rnimtv Road <br />construction concerns. That project is upstream approximately 1 mile from the County Road <br />6 site, and is an integral part of the Lx>ng Lake Improvement Project. <br />In reviewing the Orono Countv Road 5 project. Gustafson was asked by saff to ^ <br />coiS^icto plans and the construction process. His comments of September 13th are <br />summarized as follows; <br />1 A haul route and disposal location map. construction phasing schedule, and a traffic <br />Ltrol plan must be submined to the City for approval pnor to commencmg with the <br />work. <br />Written construction schedule must be updated or modified as necessaiy to accurately <br />reflect the rate and progress on the project. <br />A preconstruction conference should be held with the MCWD. contractor. City. County <br />and other parties involved in the project. <br />Traffic control for the project should include a minimum of traffic control signs and <br />devices conforming to the MMUTCW, flag men, a street sweeper, a saiidmg truck and <br />a bobcat. The equipment will be necessary because it will impossible to remove mud <br />from Ures before leaving the site. <br />The MCWD should be responsible for cleaning die surface of any <br />becomes soiled due to ±e construction activities on this project. When the M <br />constructed the Gleason Lake p.oject in 1994. there were many problems associated with <br />hauling on Highway 12. <br />Deoending on the haul route proposed a letter of credit in an amount calc^ted by the <br />Ci^ should be provided for potential damage to the <br />should be in addition to ^ <br />For safera'i^'^ in times of inclement weather or early thaw, the City must ^ <br />authority to stop ail hauling activity untU such time that the City determines necessary^ <br />The City Engineer also asks the foUowing clarifications or that additional detaU be provided; <br />What seeding mixture is proposed. wUl fertUizer be used, what is planned for disposal <br />of the cleared trees? j ^ 5 <br />4. <br />5. <br />6. <br />7.V / <br />1.
The URL can be used to link to this page
Your browser does not support the video tag.