My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-20-1995 Planning Packet
Orono
>
Planning Commission
>
1995
>
11-20-1995 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 10:44:03 AM
Creation date
10/5/2023 8:44:35 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
433
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
c. The MCWD shall not locate perntanenily within the Easement Area any <br />equipment, buildings or other structures except the outlet structure identified in Exhibit 2 <br />hereto, provided that the MCWD may temporarily locate equipment in the Easement Area for <br />construction or maintenance purposes; <br />f. The access road for maintenance of the wetland detention basin shall be <br />aligned as set forth in Exhibit 2 hereto, shall follow the natural grade of the site without <br />excavation or other modification of the existing landscape, and sh^l have a cleared right-of- <br />way width not exceeding 20 feet, with a natural surface not covered with gravel, rock, or <br />impervious surface; <br />g. The wetland detention basin shall be constructed and completed within <br />six months after commencement of construction activities, provided that the MCWD may <br />extend the construction schedule to respond to a force majeure event beyond its control, and <br />provided further that MCWD shall use its best efforts to minimize any such necessary <br />extension; <br />h. In constructing the Project, and thereafter operating and maintaining it. <br />the MCWD shall require its employees, contractors, and agents to use the best reasonably <br />available techniques for controlling erosion and for minimizing disruption or damage, either <br />temporary or permanent, to the property, resulting from clearing, grubbing, excavating, <br />damming, ditching or any other construction activities and the equipment and personnel <br />associated therewith; <br />i. After the Project has been initially constructed and/or any operational or <br />maintenance activities thereafter performed, the MCWD shall cause its employees. <br />537/22080000 5/23/95
The URL can be used to link to this page
Your browser does not support the video tag.