My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-20-1995 Planning Packet
Orono
>
Planning Commission
>
1995
>
11-20-1995 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 10:44:03 AM
Creation date
10/5/2023 8:44:35 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
433
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
c <br />The Minnehaha Creek Watershed District (MCWD) has approved a plan for <br />improving the water cjuality of Long Lake. This plan designates certain property <br />south of County Road 6 in the City of Orono, identified in attached Exhibit 1 <br />(hereafter referred to as the "Subject Property^) as the site for a two-cell wetland <br />detention pond with associated weirs, fish barriers, access roadway and other <br />structures (the "Orono Project"), designates certain ether property near Dear <br />Road in the City of Medina as the site for an additional two-<ill wetland detention <br />system (the "Medina F*roject"), and improves two existing detention basins in the <br />City of Long Lake (the "Long Lake Project"). <br />The MCWD committed to the following conditions in its agreement with the <br />owners of the Subject Property: <br />a. The MCWD will complete the Medina Project in accordance with the <br />plans included as attached Exhibit 2 prior to beginning the Orono Project. <br />bt The wetland detention basin in the Orono Project shall be located and <br />shall be of the size, volume and shape in strict conformance with the conceptual <br />design set forth in attached Exhibit 3. <br />c The MCWD shall not locate permanently within the Subject Property <br />any equipment, buildings or other structxires except the outlet structure identified in <br />Exhibit 3, provided that the MCWD may temporarily locate equipment on the <br />Subject Property for construction or maintenance purposes. 'f' <br />d- The access road for maintenance of the wetland detention basin shall <br />be aligned as set forth in Exhibit 3, shall follow the natural grade of the site without <br />excavation or other modification of the existing landscape, and shall have a cleared <br />right-of-way width not exceeding 20 feet, with a natural surface not covered with <br />gravel, rock or impiervious surface. <br />f. The wetland detention basin shall be constructed and completed %vith <br />six months after commencement of construction activities. <br />g In constructing the Orono Project, and thereafter operating and <br />maintaining it, the MCWD shall require its employees, contractors or agents to use <br />the best reasonably available techniques for controlling erosion and for minimizing <br />disruption or damage, either temporary or permanent, to the Subject Property <br />resulting from clearing, grubbing, excavating, damming, ditching or any other <br />construction activities and the equipment and personnel associated therewith. <br />h. After the Orono Project has been initially constructed and/or any <br />operational or maintenance activities thereafter performed, the MCWD shall cause <br />its employees, contractors or agents to employ promptly the best reasonably <br />available techniques for restoring to their original appearance and characteristics any
The URL can be used to link to this page
Your browser does not support the video tag.