My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-20-1995 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1990-1999
>
1995
>
11-20-1995 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2023 10:44:03 AM
Creation date
10/5/2023 8:44:35 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
433
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTHS OF THH ORONO PLANNING COMMISSION <br />MFLTIMi IILLDON NOVLMBLR 20, 1W5 <br />(#8 - #2078 Jensen Homes - Continued) <br />Lindquist said he saw Knight’s concern with losing his right to subdivide in the future as <br />the ordinance under item #1 would aftVect his abilit> to be served b\ this easement road <br />Knight agreed that this would adversely atVect his property Lindquist added that even <br />though this was true. Staff'cannot violate the code now in order to not atf'ect a possible <br />future application It was noted that the ordinance would still be in elflect ev en if it was <br />not listed in the restdiition <br />Mabusth suggested that Knight bring this concern before the Council. <br />Lindquist moved, Hawn seconded, to recommend approval of Application #2078 with <br />Staff recommendations I, 2, 3, 4, 5, 6. and 8 \’ote Aves 5, Navs 0 <br />(#9) #20*3 BERNICE M. Z1 MBl SC'H, 1535 LONG LAKE BLVD. - VARIANCES <br />- PUBLIC HEARING - 10:18-10:27 P.M. <br />The ('ertificate of Mailine and Affidavit of Publication were noted. <br />The Applicant was present. <br />Mabusth reported that the application was for hardcover variance to replace a lakeshore <br />deck with stairs There would be no changes in hardcover in the 0-75’ zone at 16 29?i or <br />in the 75-250' zone at 87.35“ o Structural coverage would remain the same at 20*1 o. <br />There are no setback variances required <br />Karen Hessian, the applicant's daughter, said there were areas where plastic is located <br />under the landscaping which could be removed Mabusth said this would result in <br />reductions of 2 8%, or 131 s.f, in the 0-75' zone, and 3.5%, or 162 s f, in the 75-250 s.f <br />Lindquist asked if not all of the plastic could be removed or if some were needed on the <br />steep hill Hessian said the plastic on the hill was probably for erosion control, but on top <br />of the hill and by the house, the plastic could be removed. <br />Peterson asked w hat Staff would recommend regarding removal of plastic from the hill <br />area Mabusth said she would need to consult with the City Engineer He did note there <br />were timbers in the area. Peterson asked Mark Gronberg, who was •a attendance, if the <br />plastic in that area could be removed Gronberg said it was a possibility <br />Hessian was asked for a time frame She said the plan was to reconstruct the deck in the <br />spring Lindquist said this would allow the Engineer to review and make a <br />recommendation Hessian noted that her mother was out of town now but would be home <br />to attend the December meeting.
The URL can be used to link to this page
Your browser does not support the video tag.