My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-16-1995 Planning Packet
Orono
>
Planning Commission
>
1995
>
10-16-1995 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 2:42:56 PM
Creation date
10/4/2023 2:29:51 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B R w INC. <br />Planning <br />Tramportjtion <br />Engincenng <br />Urban Design <br />Thresher Square <br />700 Third Street So <br />Minneapolis. <br />MN 55415 <br />612/370-0700 <br />Fax 612/370-1378 <br />Denver <br />Milwaukee <br />Minneapolis <br />Orlando <br />Phoenix <br />Portiand <br />San Diego <br />Seattle <br />K <br />October 11,1995 <br />Mr. Michael P. GatTron <br />Assistant Planning & Zoning Administrator <br />City of Orono <br />P.O. Box 66 <br />Crytal Bay, MN 55323 <br />RE: Scotch Pine Addition <br />City Zoning File #2065 <br />BRW File 3233AOO <br />Dear Mike: <br />This letter is in response to comments from your letter dated September 14, 1995. <br />Specifically, I would like to SKldress the environmental benefits from this project. <br />A budget analysis program was used to estimate the contaminant loading for the <br />before and after conditions for the proposed street vacation. The results of the budget <br />analysis show a contaminant reduction of approximately 50% for the drainage area <br />contributing to the adjacent wetland and ultimately to Lake Minnetonka. <br />This analysis does not take into account the oils, rubber, and other garbage <br />commonly associated with street run-off that currently enters directly into the <br />wetland by way of the existing storm sewer. <br />A permit has been applied for through the Minnehaha Creek Watershed District, and <br />the plans for this project have been revised to reflect the comments of the Board. A <br />Site/Grading plan was submitted to your office on 9/13/95, which addresses erosion <br />control, utility adjustments, and pavement removal. <br />If you have any questions, please call me at 373-6362. <br />Sincerely, <br />BRW, INC. <br />S.Sandberg, EIT <br />Project Engineer <br />Sam Marfield <br />Keith DahimRW <br />c: <br />C fcr —#r-rr—
The URL can be used to link to this page
Your browser does not support the video tag.