My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-16-1995 Planning Packet
Orono
>
Planning Commission
>
1995
>
10-16-1995 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 2:42:56 PM
Creation date
10/4/2023 2:29:51 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
To: <br />From: <br />Date: <br />Subject: <br />Chair Sieve Peterson and Orono Planning Commission Members <br />Ron Moorse. City Administrator <br />Michael P. Gaffron. Assistant Planmng & Zoning Administrator <br />August 18. 1995 <br />#2056 Michael and Barbara Wigley. 1035 Tonkawa Road - Conditional Use <br />Permit - Public Hearing <br />Zoning District: LR-lB. Single Family Lakeshore Residential, One Acre <br />Application: Request for land alteration CUP and variance to excavate in 0-75’ zone and install <br />boulder retaining walls. <br />Pertinent Code Sections <br />• Section 10.55. Subd. 8/Section 10.56, Subd 16 (J)/Section 10.22, Subd. 2: <br />Grading prohibited within 75’ of lake. <br />• Section 10.22. Subd. 2/Seciion 10.56, Subd. 16 (L): No hardcover allowed <br />within 75’ of lake. <br />• Section 10.03, Subd. 19: CUP required for lakeshore alteration. <br />List of Exhibits <br />A - Application <br />B - Plat Map <br />C - Property Owners’ List <br />D - Letter of Request and Cross-Section Sketch Plan <br />E - Site Plan <br />F - Survey/Topography (not as-built) <br />G - Letter from City Engineer <br />H - Comprehensive Plan Excerpts <br />I - Watershed District Denial Documentation June, 1995 <br />J - Staff Sketch <br />Summaity- <br />Applicant proposes to construct two boulder walls within 75' of the shoteline one at the <br />too of a 2:1 slope the other at the base of that slope in the flood plain netet to the lake. A the <br />base of the slope, the intent is to excavate within the flood plain, creating a terrace at to wa er <br />edge approxtaateiy 10-15' deep, backed by a 3.5’ boulder wall, placing excavated tnatenal <br />above the wall (see sketch. Exhibit D).
The URL can be used to link to this page
Your browser does not support the video tag.