My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-13-1996 Council Packet
Orono
>
City Council
>
1995
>
02-13-1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 4:14:42 PM
Creation date
10/3/2023 4:12:37 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR COUNCIL ACTION A- 'A- <br />DATE: 1993-^*. <br />ITEM NO <br />Department Approval: <br />Name Jeanne A. Mabusih <br />Title Building & Zoning Administrator <br />Administrator Reviewed:Agenda Section: <br />Zoning <br />Item Description: #1986 David Yorks. 2825 Casco Point Road - After-ihe-Fact Conditional Use <br />Permit/V^ariance - Resolution <br />Zoning District: LR-IC. <br />Total lot area = 14,835 s.f. <br />Please refer to staff memo of Januar>' 11, 1995 for pertinent ordinances involved in this review. <br />Additional Exhibits <br />Kl- Revised Plan <br />K2- Section of Walls <br />L - David A. Stockdale, Pres, of Edgework Builders Inc. dated 1/16/95 <br />Brief Review of Application <br />Applicant contacted the City in November of 1994 to advise of an immediate need to replace a <br />retaining wall that was in a serious state of disrepair and if not replaced before spring rains <br />would more than likely collapse into their lakeshore. Staff advised applicant of the abbreviated <br />holiday schedule for the Planning Commission noting that the City would be unable to process <br />a conditional use permit application to allow the installation of the wall before a January <br />meeting. It would be impossible to install the wall during the months of January and Februaiy <br />because of the condition of the soil. The applicant advised of an immediate emergency and need <br />to proceed in early November to replace wall. Before staff would allow construction to begin, <br />the applicant was advised that the City Engineer must inspect the site to confirm if there was a <br />potential for collapse of the wall and the bank and if he concurred then applicant would provide <br />all the necessary engineering plans and specs for his review and recommendation. <br />The inspection was completed by both the Zoning Administrator and Mr. Gustafson at which <br />time he cocfirmed that wall was in serious disrepair with potential for collapse. Staff also <br />remembered that properties to the immediate west located on the same bank sustained major <br />damage when older retaining walls collapsed during the 1987 storm. <br />The applicant was required to file a conditional use permit before the work could commence. <br />The original wall is constructed of timbers and was approximately 6-7 ’ in height. The current <br />wall installed with Allan Block extends from the east side at approximately 5'A' to the west at
The URL can be used to link to this page
Your browser does not support the video tag.