My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-13-1996 Council Packet
Orono
>
City Council
>
1995
>
02-13-1996 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 4:14:42 PM
Creation date
10/3/2023 4:12:37 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
constitute the actusl "Constnjction Cost" and shall be so <br />referred to hereinafter. <br />3. The State with its own forces and equipment or by <br />contract shall perform the traffic control signal work provided <br />for under State Project No. 2713-64, State Aid Project <br />No. 152-101-10 and Federal Aid Project No. NH 010-2(95) with the <br />Construction Costs stated as follows: <br />a. Trunk Highway No. 12 (Wayzata Boulevard) at <br />Willow Drive. Remove the existing hazard <br />identification beacon and install a new <br />traffic control signal with street lights, <br />EVP System and signing. Estimated <br />Construction Cost is $118,500.00 which <br />includes State furnished materials. State's <br />share is 50 percent. Orono's share is <br />25 percent. Long Lake's share is 25 percent <br />(State's portion is 80% of this 25 percent. <br />City's portion is 20% of this 25 percent.). <br />b. Trunk Highway No. 12 (Wayzata Boulevard) from <br />Old Crystal Bay Road to County State Aid <br />Highway No. 146 (South Brown Road) - Lake <br />Street. Install interconnect. Estimated <br />Construction Cost is $37,000.00 which <br />includes State furnished materials. State's <br />share is 57 percent. Orono's share is <br />73012 <br />-3-
The URL can be used to link to this page
Your browser does not support the video tag.