Laserfiche WebLink
constitute the actusl "Constnjction Cost" and shall be so <br />referred to hereinafter. <br />3. The State with its own forces and equipment or by <br />contract shall perform the traffic control signal work provided <br />for under State Project No. 2713-64, State Aid Project <br />No. 152-101-10 and Federal Aid Project No. NH 010-2(95) with the <br />Construction Costs stated as follows: <br />a. Trunk Highway No. 12 (Wayzata Boulevard) at <br />Willow Drive. Remove the existing hazard <br />identification beacon and install a new <br />traffic control signal with street lights, <br />EVP System and signing. Estimated <br />Construction Cost is $118,500.00 which <br />includes State furnished materials. State's <br />share is 50 percent. Orono's share is <br />25 percent. Long Lake's share is 25 percent <br />(State's portion is 80% of this 25 percent. <br />City's portion is 20% of this 25 percent.). <br />b. Trunk Highway No. 12 (Wayzata Boulevard) from <br />Old Crystal Bay Road to County State Aid <br />Highway No. 146 (South Brown Road) - Lake <br />Street. Install interconnect. Estimated <br />Construction Cost is $37,000.00 which <br />includes State furnished materials. State's <br />share is 57 percent. Orono's share is <br />73012 <br />-3-