Laserfiche WebLink
Raise 1’ <br />300 cu. yds. common borrow <br />700 sq. yds mill bituminous surface @ 2.00 <br />600 tons cl 5 aggregate @ 8.02 <br />50 ft. 18" CMP @ 10.50 <br />150 tons bituminous surface @ 26.00 <br />900 sq. yd stabilization fabric @ 2.00 <br />600 lin. ft. of silt fence @ 4.00 <br />black dirt seeding sod, etc. lump sum <br />n/c <br />$ 1,400 <br />4,812 <br />525 <br />3,900 <br />1,800 <br />2,400 <br />1.500 <br />$16,337 <br />Raise 2* <br />700 cu. yd. borrow <br />800 sq. yds. mill bimminous surface @2.00 <br />800 tons cl 5 aggregate @8.02 <br />200 tons bituminous surface @ 26.00 <br />1,200 sq. yds. stabilization fabric @ 2.00 <br />800 lin. ft. silt fence @ 4.00 <br />50 lin. ft. 18" CMM @ 10.50 <br />black dirt seeding sod, etc. lump sum <br />n/c <br />$ 1,600 <br />6,416 <br />5.200 <br />2,400 <br />3.200 <br />525 <br />1.700 <br />$21,041 <br />Raise 3" <br />1,200 cu. yds. common borrow <br />1,100 sq. yds. mill bimminous surface @ 2.00 <br />1,000 tons cl 5 aggregate @ 8.02 <br />250 tons bimminous surface @ 20.00 <br />1,500 sq. yds. stabilization fabric @ 1.00 <br />1,000 lin. ft. silt fence @ 4.00 <br />50 lin. ft. 18" CMP @ 10.50 <br />black dirt seeding sod, etc. lump sum <br />n/c <br />$ 2,200 <br />8,020 <br />6.500 <br />1.500 <br />4.000 <br />525 <br />2.000 <br />$24,745