Laserfiche WebLink
KeDy Avenue Stre^ Construction (Raise 2') <br />700 Cu. Yd.Common borrow @ $6 00/cu. yd.$ 4,200.00 <br />800 Sq. Yd.Mill bituminous surface @ $2.00/sq. yd.1,600.00 <br />800 Ton Class 5 aggregate base @ $9.00/ton 7,200.00 <br />200 Ton Bituminous surface @ $26.00/ton 5,400.00 <br />200 Sq. Yd.Stabilization fabric @ S2.(X)/sq. yd.2,400.00 <br />800 Lin. Ft.Silt fence @ S4.00/lin. ft.3,200.00 <br />Lump Sum Restoration 3,000.00 <br />50 Lin. Ft.18" culvert @ S20.00/lin. ft.1.000.00 <br />Total Construction $28,000.00 <br />10% Contingencies 2.800.00 <br />$30,800.00 <br />30% Legal, Eng., Admin.9.240.00 <br />Total Project Cost $40,040.00 <br />KeUy Avenue Street Ci I »ol (Li^tweigfat Fill) <br />1500 Cu. Yd.Common excavation (Q $6.00/cu. yd.$ 9,000.00 <br />550 Cu. Yd.Wood chips (Q $12.00/cu. yd.6,600.00 <br />1,200 Cu. Yd.Granular backftll @ $6.00/cu. yd.7,200.00 <br />700 Ton Class 5 aggregate base Q $9.(X)/ton 6,300.00 <br />200 Ton Bituminous surface ® $26.00/ton 5,200.00 <br />1,200 Sq. Yd.Stabilization fabric @ $2.00/sq. yd.2,400.00 <br />Lump Sum Restoration 3,000.00 <br />50 Lin. Ft.18' Culvert ® $20.00/lin. ft.1.000.00 <br />Total Construction $40,700.00 <br />10% Contingencies 4.070.00 <br />$44,770.00 <br />30% Legal, Eng., Admin.13.430.00 <br />Total Project Cost $58,200.00 <br />Bonestroo, Rosene, Anderlik <£ Associates, Inc. <br />13976.ipt