My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-23-1995 Council Packet
Orono
>
City Council
>
1995
>
01-23-1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 4:05:49 PM
Creation date
10/3/2023 4:04:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Alternate D Gravity Storm Sewer <br />880 Lin. ft.18" PVC O $35.00/lin. ft.S30.800.00 <br />6 Ea.18" CM Apron @ $125.00/ea.750.00 <br />3 Ea.Manholes @ $l,500.00/ea.4,500.00 <br />460 Sq. yd.Street Restoration @ $25.00/sq. yd.11,500.00 <br />4,000 Sq. yd.Sod @ $3.00/sq. yd.12.000 00 <br />Total $59,550.00 <br />10% Contingencies 5.950 00 <br />$65,500.00 <br />30% Legal, Eng., Admin.19.650 00 <br />Total Alternate D $85,150.00 <br />Alternate E Storm Sewer Lift Station <br />950 Lin. ft.6" PVC force main @ $15.00/Iin. ft.$14,250.00 <br />1 Ea.Manhole (6' diameter)3,500.00 <br />Lump Sum Install salvaged pumps 5,000.00 <br />Lump Sum Install electrical service 5,000.00 <br />I Ea.Inlet control structure 2,500.00 <br />950 Lin. ft.Restoration @ SlO.OO/lin. ft.9.500.00 <br />Total $39,750.00 <br />10% Contingencies 3.975.00 <br />$43,725.00 <br />30% Legal, Eng., Admin.13.115.00 <br />Total Alternate E $56,840.00 <br />KeDv Avenue Street Construction (Raise 1') <br />300 Cu. Yd.Common borrow (Q $6.00/cu. yd.$ 1,800.00 <br />700 Sq. Yd.Mill bituminous surface & $2.00/sq. yd.1,400.00 <br />600 Ton Class 5 aggregate base @ $9.00/ton 5,400.00 <br />150 Ton Bituminous surface @ S26.00/ton 3,900.00 <br />900 Sq. Yd.Stabilization fabric (8> $2.00/sq. yd.1,800.00 <br />600 Lin. Ft.Silt fence <3> S4.00/Iin. ft.2,400.00 <br />Lump Sum Restoration 2,500.00 <br />50 Lin. Ft.18" culvert @ $20.00/lin. ft.1.000.00 <br />Total Construction $20,200.00 <br />10% Contingencies 2.020.00 <br />$22,220.00 <br />30% Legal, Eng., Admin.6.660.00 <br />Total Project Cost <br />9 <br />$28,880.00 <br />Bonestroo, Rosene, Anderlik <£ Associates, Inc. <br />13976.IP*
The URL can be used to link to this page
Your browser does not support the video tag.