My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-18-1995 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1990-1999
>
1995
>
09-18-1995 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 2:43:28 PM
Creation date
9/28/2023 4:30:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON SEPTEMBER 18, 1995 <br />(#3 - #2000 Conlen Cloutier - Continued) <br />Peterson asked if there were any other issues to consider Weckman noted that no park <br />dedication tee would be required The City Attorney said the property had already been <br />subdivided as of record There was also a ditference of opinion on whether this was one <br />parcel or 3 Weckman said Mabusth had requested language be added to note that any <br />future subdivision must meet current standards and codes It was flulher noted that the <br />property has been assessed for two water and one sewer connection but would require <br />assessment of another sewer and SAC charge Cloutier responded that it was his belief <br />this was incorrect as lot 4 was connected to sewer from Frederick Street He added that <br />when water was provided on Casco in 1971, a stub line came from Casco to his property. <br />Gaffron said he would follow up on the charge for the sewer unit W'eckman said if the <br />sewer line crosses a neighbor's, the City would need to verify- and identify any easements. <br />During public comment, Wilbur Anderson, 3555 Frederick Street, read a letter from Norm <br />and Rusty Paurus The letter said the Paurus' approved the application if no changes were <br />submitted from the 3/20/95 submittal, or asked to allow their feedback on any charges <br />made. The Paurus ’ asked the proposed house be moved 5-6' to the northeast to save <br />several mature trees and that all construction and driveways comply with current City <br />ordinarices <br />Peterson asked for Cloutier's comments on the letter The applicant was unsure what <br />trees were being referred to as there was a solid line of trees on the lot. Cloutier did not <br />believe it to be reasonable to redesign the house with the topography since there was no <br />lack of trees on this or neighboring properties. Peterson said the proceedings cannot be <br />stopped because a neighbor was not in attendance. <br />Commissioners noted that the driveway was the main concern with the application. The <br />lack of 1/2 acre contiguous on lot I because of the configuration of the driveway was the <br />problem. <br />Cloutier commented that lot 1 consisted of 3/4 acre and contained woods continuous over <br />to Frederick Street. He asked for approval of the driveway for he and his son. <br />Lindquist said he was uneasy with the proposal. The applicant was told that there would <br />be a time when the property did not serve Cloutier and his son. Lindquist noted that the <br />roadway by Paurus' lot 2 could serve both Paurus and lot 3. <br />Rowlette asked if Frederick Street was used on a daily basis. Cloutier said he used the <br />access from Casco. Rowlette noted that the Casco driveway was not well maintained. <br />The applicant said red rock had recently been brought in but said further destruction of the <br />driveway would occur during the construction process. Rowlette said she saw no reason <br />for the middle driveway to serve lots 3 and 4 when outlot 1 was already in place to serve <br />those lots <br />8
The URL can be used to link to this page
Your browser does not support the video tag.