Laserfiche WebLink
Everv effort was made to maximize wetland mitigation within the project design and area <br />consents and a significant amount of money has been budgeted to ensure wetland mitigation be <br />performed in an appropriate and successful marmer. Th.e proposed projects impact a large area of <br />wetland but the impacts are much less than projects which involve filling or drainin-, <br />subsequent development activities. Tne MC%VTD feels the net result of the proposed project is a <br />more diverse wedand habitat as well as improved water quality for Long Lake. For the above <br />reasons and the detailed informadon provided with the permit application, the MCWD feels the <br />overall project is self mitigating with respect to wedands. <br />N:FRM«A£S»lh»